AD 2002-13-01 Airworthiness Directives; McDonnell Douglas Model MD-90-30 Airplanes

2002-07-31
2002-06-26
—
—
Airframe
—

Models named: MD-90-30. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

Model MD-90-30 airplanes, as listed in McDonnell Douglas Alert Service Bulletins MD90-24A046, Revision 02, dated March 26, 2001; and MD90-24A047, Revision 01, dated July 31, 2000; certificated in any category. Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (c) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance

Required as indicated, unless accomplished previously. To prevent future damage to the galley power feeder cable as well as to detect and correct existing damage to the galley power feeder cable, which could result in electrical arcing, possibly leading to damage to adjacent structures and to fire in the airplane, accomplish the following: Inspection and Follow-On Actions (a) For McDonnell Douglas Model MD-90-30 airplanes as identified in McDonnell Douglas Alert Service Bulletin MD90-24A046, Revision 02, dated March 26, 2001: Within 90 days after the effective date of this AD, do a one-time general visual inspection of the galley power feeder cable located above the main cabin ceiling supports in the overwing area on the left side for damage caused by chafing—particularly near the ends of the ceiling supports—per the Accomplishment Instructions of McDonnell Douglas Alert Service Bulletin MD90-24A046, Revision 02, dated March 26, 2001. Note 2: For the purposes of this AD, a general visual inspection is defined as: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.” Condition 1: Damage to Outer Cable Jacket or Primary Insulation (1) If any damage to the outer cable jacket or the primary insulation is found, prior to further flight, repair the scuffed jacket or insulation and modify the galley power feeder cable installation by installing sleeving over the wire assembly per the alert service bulletin. Condition 2: Damage to Power Feeder Cable Conductor (2) If any damage to the power feeder cable conductor is found, prior to further flight, repair the damaged cable by installing a splice at the damaged location, modify the galley power feeder cable installation by installing sleeving over the cable assembly, and do a functional test of the galley equipment per the alert service bulletin. Condition 3: No Damage (3) If no damage is found, prior to further flight, modify the galley power feeder cable installation by installing sleeving over the cable assembly per the alert service bulletin. Note 3: Accomplishment of the applicable actions prior to the effective date of this AD per McDonnell Douglas Alert Service Bulletin MD90-24A046, dated July 31, 1997; or Revision 01, dated February 16, 1998; is acceptable for compliance with the requirements of paragraph (a) of this AD. Modification of Installation and Re-Routing of Power Feeder Cable (b) For McDonnell Douglas Model MD-90-30 airplanes, as identified in McDonnell Douglas Alert Service Bulletin MD90-24A047, Revision 01, dated July 31, 2000: Within one year after the effective date of this AD, modify the installation of the galley power feeder cables by installing standoffs and re-route the galley power feeder cable, as shown in Figure 1 of McDonnell Douglas Alert Service Bulletin MD90-24A047, Revision 01, dated July 31, 2000, per the alert service bulletin. Note 4: Accomplishment of the applicable actions prior to the effective date of this AD per McDonnell Douglas Service Bulletin MD90-24-047, dated September 15, 1997, is acceptable for compliance with the requirements of paragraph (b) of this AD. Alternative Methods of Compliance (c) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Los Angeles ACO. Note 5: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Los Angeles ACO. Special Flight Permits (d) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. Incorporation by Reference (e) The actions shall be done in accordance with McDonnell Douglas Alert Service Bulletin MD90-24A046, Revision 02, dated March 26, 2001; and McDonnell Douglas Alert Service Bulletin MD90-24A047, Revision 01, dated July 31, 2000; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Aircraft Group, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024). Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. Effective Date (f) This amendment becomes effective on July 31, 2002. Issued in Renton, Washington, on June 14, 2002. Ali Bahrami, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 02-15660 Filed 6-25-02; 8:45 am] BILLING CODE 4910-13-P