TrackAD

Airworthiness directives › 2000-02-22

AD 2000-02-22 Airworthiness Directives; Boeing Model 747-400 Series Airplanes Equipped with Rolls-Royce RB211-524G/H and RB211-524G-T/H-T Engines

2000-02-18
2000-02-03
—
—
Engine
—

Models named: 747-400 series. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

Model 747-400 series airplanes equipped with Rolls-Royce RB211-524G/H engines, and RB211-524G-T/H-T engines; certificated in any category. Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance

Required as indicated, unless accomplished previously. To prevent inadvertent deployment of a thrust reverser during flight and consequent reduced controllability of the airplane, accomplish the following: Modifications (a) Accomplish the requirements of paragraphs (a)(1), (a)(2), and (a)(3) of this AD at the times specified in those paragraphs. Accomplishment of these actions, or installation of an additional locking system during production in accordance with production equivalent PRR 81000-39, constitutes terminating action for the inspections and tests required by paragraph (c) of AD 94-15-05, amendment 39-8976. (1) Within 36 months after the effective date of this AD: Install an additional locking system on each engine thrust reverser in accordance with the Accomplishment Instructions of Boeing Service Bulletin 747-78-2158, Revision 2, dated July 29, 1999. Note 2: Modifications accomplished prior to the effective date of this AD in accordance with Boeing Service Bulletin 747-78-2158, Revision 1, dated January 22, 1998; are considered acceptable for compliance with the applicable action specified in this amendment. (2) Concurrent with the installation required by paragraph (a)(1) of this AD, accomplish the requirements of paragraphs (a)(2)(i) and (a)(2)(ii) of this AD. (i) Accomplish the additional procedures for installation of an additional locking system on each engine thrust reverser in accordance with Rolls-Royce Service Bulletin RB.211-78-9601, Revision 5, dated February 20, 1998. (ii) Install a thrust reverser translating cowl assembly seal support in accordance with Rolls-Royce Service Bulletin RB.211-78-B207, dated November 19, 1994. (3) Prior to or concurrent with the installation required by paragraph (a)(1) of this AD, accomplish the requirements of paragraphs (a)(3)(i), (a)(3)(ii), (a)(3)(iii), and (a)(3)(iv) of this AD: (i) Modify the fuel temperature indicating system in accordance with Boeing Service Bulletin 747-73-2052, Revision 1, dated April 23, 1992; and Rolls-Royce Service Bulletin RB.211-71-9043, dated May 4, 1990. Prior to or concurrent with accomplishment of Boeing Service Bulletin 747-73-2052, Revision 1: Modify the central maintenance computer system (CMCS) hardware and software in accordance with Boeing Service Bulletin 747-45-2007, dated March 29, 1990; and Boeing Service Bulletin 747-45-2016, Revision 1, dated May 2, 1996. (ii) Install the provisional wiring for the locking system on the thrust reversers in accordance with Boeing Service Bulletin 747-78-2121, dated October 29, 1992; and 747-78-2157, Revision 2, dated November 26, 1997. (iii) Modify the integrated display system (IDS) software in accordance with Boeing Service Bulletin 747-31-2246, dated May 2, 1996. (iv) Install engine provisions to accommodate the installation of an additional locking system on each engine thrust reverser in accordance with Rolls-Royce Service Bulletin RB.211-71-9600, Revision 8, dated May 24, 1996; and RB.211-71-9608, Revision 3, dated April 18, 1997. Repetitive Operational Checks (b) Within 3,000 flight hours after accomplishing the requirements of paragraph (a) of this AD, or within 1,000 flight hours after the effective date of this AD, whichever occurs later: Perform operational checks of the number 2 and number 3 gearbox locks and of the air motor brake, in accordance with the procedures described in Appendix 1 (including Figure 1) of this AD. Repeat the operational checks thereafter at intervals not to exceed 3,000 flight hours. Corrective Actions (c) If any operational check required by paragraph (b) of this AD cannot be successfully performed as specified in the procedures described in Appendix 1 (including Figure 1) of this AD, or if any discrepancy is detected during any operational check, prior to further flight, repair in accordance with the procedures specified in the Boeing 747 Airplane Maintenance Manual. Additionally, prior to further flight, any failed operational check required by paragraph (b) of this AD must be repeated and successfully accomplished. Repeat the operational checks thereafter at intervals not to exceed 3,000 flight hours. Alternative Methods of Compliance (d) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, Transport Airplane Directorate. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. Note 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. Special Flight Permits (e) Special flight permits may be issued in accordance with §§ 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. Incorporation by Reference (f) Except as provided by paragraphs (b), (c)(1), and (c)(2) of this AD, the actions shall be done in accordance with the applicable service bulletins, which contain the specified list of effective pages:   Service bulletin referenced and date Page No. shown on page Revision level shown on page Date shown on page Boeing 747-78-2157, Revision 2, November 26, 1997 1-151 2 November 26, 1997. Boeing 747-78-2158, Revision 2, July 29, 1999 1-344 2 July 29, 1999. Boeing 747-73-2052, Revision 1, April 23, 1992 1, 3-5, 8, 10, 15-17 1 April 23, 1992.   2, 6-7, 9, 11-14, 18-41 Original June 7, 1990. Boeing 747-31-2246, May 2, 1996 1-12 Original May 2, 1996. Boeing 747-45-2016, Revision 1, May 2, 1996 1-33 1 May 2, 1996. Boeing 747-78-2121, October 29, 1992 1-20 Original October 29, 1992. Boeing 747-45-2007, March 29, 1990 1-13 Original March 29, 1990. Rolls-Royce RB.211-78-9601, Revision 5, February 20, 1998 1-4 5 February 20, 1998.   5 2 October 20, 1995.   6-21 Original August 7, 1992.   Supplement   1-3 4 February 20, 1998. Rolls-Royce RB.211-71-9600, Revision 8, May 24, 1996 1, 71-72, 72A 8 May 24, 1996.   2, 5-16, 18-32, 34-67, 73-77, 87-88 2 February 26, 1993.   3 7 October 20, 1995.   4 6 March 31, 1995.   17, 33, 86 4 February 11, 1994.   68-70, 78, 80-84 Original August 7, 1992.   79, 85, 90-95 3 December 17, 1993.   89 5 August 19, 1994.   Supplement   1-5 3 March 31, 1995. Rolls-Royce RB.211-78-B207, November 19, 1994 1-15 Original November 19, 1994.   Supplement   1 Original November 19, 1994. Rolls-Royce RB.211-71-9608, Revision 3, April 18, 1997 1, 5 3 April 18, 1997.   2-4, 6-18, 20-48 Original August 7, 1992.   19 2 July 5, 1996.   Supplement   1-3 2 April 18, 1997. Rolls-Royce RB.211-71-9043, May 4, 1990 1-18 Original May 4, 1990.   Supplement   1-2 Original May 4, 1990. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. (g) This amendment becomes effective on February 18, 2000. Appendix 1 1. Gearbox Lock and Air Motor Brake Test A. General (1) To do the test of the gearbox locks and air motor brake, you must do the steps that follow: (a) Do the deactivation procedure of the thrust reverser system. (b) Do the test of the air motor brake. (c) Do the test of the gearbox locks. (d) Do the activation procedure of the thrust reverser system. B. Equipment (1) CP30784—INA Access Platform, Rolls-Royce (2) CP30769—Protection Pads, Rolls-Royce (3) CP30785—Access Stools, Rolls-Royce (4) UT1293/1—Load Tool, Rolls-Royce (2 required) C. Procedure (Fig. 1). WARNING: DO THE DEACTIVATION PROCEDURE OF THE THRUST REVERSER SYSTEM, WHICH MUST INCLUDE THE INSTALLATION OF LOCK BARS (OR BLOCKERS), TO PREVENT THE ACCIDENTAL OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF THE THRUST REVERSER COULD CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT. (1) Do the deactivation procedure of the thrust reverser in the forward thrust position for ground maintenance. (2) Use a 0.25 inch (6.4 mm) square drive to turn the manual lock release screw to release the No. 2 and No. 3 gearbox locks. Note: It is not always easy to turn the manual lock release screws. This is because of a preload in the systems. To release the preload, lightly turn the manual cycle and lockout shafts in the stow direction. (a) Make sure the lock indicators are extended at gearboxes No. 2 and No. 3. (3) Do a test of the air motor brake: (a) IF YOU USE THE LOAD TOOLS; Try to move the translating cowl in the extend direction as follows: (1) Remove the lock bars that you installed in the deactivation procedure. (2) Install the load tools through the cutouts and into the No. 2 and No.3 gearboxes. (3) Attach the torque wrenches to the load tools. (4) Try to move the translating cowl in the extend direction. (b) IF YOU DO NOT USE THE LOAD TOOLS; Try to move the translating cowl in the extend direction as follows: (1) Remove the lock bars that you installed in the deactivation procedure. (2) Put the 0.25 inch (6.4 mm) square drive extensions into the manual cycle and lockout shaft at the No. 2 and No. 3 gearboxes. (a) Attach the standard drive tools. (3) Try to move the translating cowl in the extend direction. (c) If the translating cowl moves, replace the air motor and shutoff valve. (4) Do a test of the gear box locks: Note: The steps that follow are for the No. 3 gearbox. Then, do these steps again for the No. 2 gearbox. (a) Install the lock bars in the manual cycle and lockout shafts at the No. 2 and No. 3 gearboxes. (b) Install the INA access platform in the exhaust mixer duct. (c) Install the protection pads and the access stools. (d) Release the air motor brake: (1) Open the air motor access and pressure relief panel. (2) Pull the air motor brake release handle forward and turn it counterclockwise to lock the handle in its position. (e) Turn the manual lock release screw clockwise to engage the No. 3 gearbox lock. (1) Make sure that the lock indicator is retracted (under the surface) at gearbox No. 3. (f) Make sure No. 2 gearbox lock is released. (1) Make sure the lock indicator is extended at gearbox No. 2. (g) IF YOU USE THE LOAD TOOLS; Do a check of the lock dogs as follows: (1) Remove the lock bars from the No. 2 and No. 3 gearboxes. (2) Install the load tool through the cutout and into the No. 3 gearbox. (3) Attach the torque wrench to the load tool. CAUTION: DO NOT APPLY A TORQUE LOAD OF MORE THAN 30 POUND-INCHES (3.4 NEWTON-METERS) TO THE MANUAL CYCLE AND LOCK OUT SHAFT. A LARGER TORQUE LOAD CAN CAUSE DAMAGE TO THE MECHANISM. (4) Apply a torque counterclockwise through the manual wind position of the No. 3 gearbox. (a) If the translating cowl does not move, the lock bar touched one of the two lock dogs. (b) If the translating cowl moved, lock the thrust reverser until the No. 3 gearbox is replaced. (5) Turn the manual lock release screw counterclockwise to release the gearbox lock. (a) Make sure that the indication rod comes out of the No. 3 gearbox. (6) Turn the manual cycle and lockout shaft counterclockwise a 1/4 of a turn. (7) Turn the manual lock release screw clockwise to engage the No. 3 gearbox lock. (a) Make sure that the indication rod is fully retracted (under the surface). CAUTION: DO NOT APPLY A TORQUE LOAD OF MORE THAN 30 POUND-INCHES (3.4 NEWTON-METERS) TO THE MANUAL CYCLE AND LOCKOUT SHAFT. A GREATER TORQUE LOAD CAN CAUSE DAMAGE TO THE MECHANISM. (8) Apply a torque counterclockwise through the manual wind position of the No. 3 gearbox. (a) If the manual cycle and lockout shaft can not be turned more than approximately 1/4 turn, the second lock dog is serviceable. (b) If the manual cycle and lockout shaft can be turned more than approximately 1/4 turn, the second lock dog is unserviceable. Lock the thrust reverser until the No. 3 gearbox is replaced. Note: The two lock dogs are found 1/2 turn apart when you use the manual cycle and lockout shaft. If necessary, do the check again to make sure that the lock dogs are serviceable. (9) Do the procedure given above for the No. 2 gearbox lock. (h) IF YOU DO NOT USE THE LOAD TOOLS; Do a check of the lock dogs as follows: (1) Remove the lock bars from the No. 2 and No. 3 gearboxes. (2) Put the 0.25 inch (6.4 mm) square drive extensions into the manual cycle and lockout shaft at the No. 2 and No. 3 gearboxes. (a) Attach the standard drive tools. CAUTION: DO NOT APPLY A TORQUE LOAD OR MORE THAN 30 POUND-INCHES (3.4 NEWTOWN-METERS) TO THE MANUAL CYCLE AND LOCKOUT SHAFT. A LARGER TORQUE LOAD CAN CAUSE DAMAGE TO THE MECHANISM. (3) Apply a torque counterclockwise through the manual wind position of the No. 3 gearbox. (a) If the translating cowl does not move, the lock bar touched one of the two lock dogs. (b) If the translating cowl moved, lock the thrust reverser until the No. 3 gearbox is replaced. (4) Turn the manual lock release screw counterclockwise to release the gearbox lock. (a) Make sure that the indication rod comes out of the No. 3 gearbox. (5) Turn the manual cycle and lockout shaft counterclockwise a 1/4 of a turn. (6) Turn the manual lock release screw clockwise to engage the No. 3 gearbox lock. (a) Make sure that the indication rod is fully retracted (under the surface). CAUTION: DO NOT APPLY A TORQUE LOAD OF MORE THAN 30 POUND-INCHES (3.4 NEWTON-METERS) TO THE MANUAL CYCLE AND LOCKOUT SHAFT. A GREATER TORQUE LOAD CAN CAUSE DAMAGE TO THE MECHANISM. (7) Apply a torque counterclockwise through the manual wind position of the No. 3 gearbox. (a) If the manual cycle and lockout shaft can not be turned more than approximately 1/4 turn, the second lock dog is serviceable. (b) If the manual cycle and lockout shaft can be turned more than approximately 1/4 turn, the second lock dog is unserviceable. Lock the thrust reverser until the No. 3 gearbox is replaced. Note: The two lock dogs are found 1/2 turn apart when you use the manual cycle and lockout shaft. If necessary, do the check again to make sure that the lock dogs are serviceable. (8) Do the procedure given above for the No. 2 gearbox lock. (5) Install the lock bars in the manual cycle and lockout shafts at the No. 2 and No. 3 gearboxes. (6) Apply the air motor manual brake: (a) Turn the air motor brake release handle clockwise and then release. (b) Close the air motor access and pressure relief panel. (7) Make sure the No. 2 and No. 3 gearbox locks are released. (a) Makes sure the lock indicator rods are extended at the No.2 and No. 3 gearboxes. (8) IF YOU USE THE LOAD TOOLS; Try to move the translating cowl in the extend direction as follows: (a) Remove the lock bars from the No. 2 and No. 3 gearboxes. (b) Install the load tools through the cutouts and into the No. 2 and No. 3 gearboxes. (c) Attach the torque wrenches to the load tools. (d) Try to move the translating cowl in the extend direction. (9) IF YOU DO NOT USE THE LOAD TOOLS; Try to move the translating cowl in the extend direction as follows: (a) Remove the lock bars from the No. 2 and No. 3 gearboxes. (b) Put the 0.25 inch (6.4 mm) square drive extension into the manual cycle and lockout shaft at the No. 2 and No. 3 gearboxes. (1) Attach the standard drive tools. (c) Try to move the translating cowl in the extend direction. (10) If the translating cowl moves, do the full test again. (a) If the translating sleeve moves again, lock the thrust reverser until you can replace the two locking gearboxes and the air motor and shutoff valve. (11) Remove the access stools and protection pads. (12) Remove the INA access platform from the exhaust mixer duct. (13) Do the activation procedure of the thrust reverser system. (14) Do the functional test of the thrust reverser system. BILLING CODE 4910-13-P ER03FE00.006 Issued in Renton, Washington, on January 25, 2000. Donald L. Riggin, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 00-2089 Filed 2-2-00; 8:45 am] BILLING CODE 4910-13-C

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1