AD 2003-11-01 Airworthiness Directives; Boeing Model 747 Series Airplanes

2003-07-03
2003-05-29
39-13160
2002-NM-28-AD
Airframe
—

Models named: 747 series. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

All Model 747 series airplanes, certificated in any category. Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (g)(1) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance

Required as indicated, unless accomplished previously. To prevent ice accumulation on the lateral flight control cables and/or components due to water entering the wheel well of the landing gear and freezing, which could restrict or jam control cable movement, resulting in loss of controllability of the airplane, accomplish the following: Restatement of Requirements of AD 89-12-07 Repetitive Inspections/Cleaning (a) Within 15 months after July 10, 1989 (the effective date of AD 89-12-07, amendment 39-6232), unless accomplished 3 months before July 10, 1989, and thereafter at intervals not to exceed 18 months: Gain access to the cavity aft of the wing center section and remove all debris and foreign material, clean the cavity, and verify all drains are open and clean. New Requirements of This AD Repetitive Tests/Inspections of the Drainage System/Corrective Action (b) At the later of the times specified in paragraphs (b)(1) and (b)(2) of this AD, do the actions required by paragraph (c) of this AD. (1) Within 18 months after the effective date of this AD. (2) Within 18 months since date of issuance of the original airworthiness certificate, or since date of issuance of the export certificate of airworthiness, whichever is first. (c) Do the actions specified in paragraphs (c)(1), (c)(2), and (c)(3) of this AD per the Work Instructions of Boeing Alert Service Bulletin 747-51A2057, dated February 21, 2002. (1) Do a test (including doing a general visual inspection of the external drains, reducer, and drain lines, and sending 3 to 5 pounds per square inch compressed air through the drain line) of the drainage system of the canted pressure deck for discrepancies (including damage, holes, signs of frozen water, and signs of blockage), per Work Package 1 of the Work Instructions of the service bulletin. Repeat the test at least every 18 months. (2) Clean the drainage system for the canted pressure deck, and do a general visual inspection of the system for discrepancies, per Work Package 2 of the Work Instructions of the service bulletin. Repeat the cleaning and inspection at least every 18 months. Accomplishment of this paragraph terminates the requirements in paragraph (a) of this AD. (3) Except as required by paragraph (f) of this AD: If any discrepancy is found during any inspection or test required by paragraphs (c)(1) and (c)(2) of this AD, before further flight, repair per the Work Instructions of the service bulletin. Repetitive Inspections of the Canted Pressure Deck/Corrective Action (d) At the later of the times specified in paragraphs (d)(1) and (d)(2) of this AD: Do a general visual inspection of the canted pressure deck for discrepancies (including loose or missing fasteners; loose, missing, or cracked sealant; and leak paths), per Work Package 3 of the Work Instructions of Boeing Alert Service Bulletin 747-51A2057, dated February 21, 2002. If any discrepancy is found, before further flight, repair (including replacing any loose or missing fastener or loose, missing, or cracked sealant; and repairing any leak found) per the service bulletin; except as required by paragraph (f) of this AD. Repeat the inspection at least every 36 months. Note 2: For the purposes of this AD, a general visual inspection is defined as: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.” (1) Within 36 months after the effective date of this AD. (2) Within 36 months since date of issuance of the original airworthiness certificate, or since date of issuance of the export certificate of airworthiness, whichever is first. Repetitive Cabin Pressurization Tests/Corrective Action (e) At the later of the times specified in paragraphs (e)(1) and (e)(2) of this AD: Do a cabin pressurization test to check for leaks in the canted pressure deck, per Work Package 4 of the Work Instructions of Boeing Alert Service Bulletin 747-51A2057, dated February 21, 2002. If any leak is found, before further flight, repair per the service bulletin; except as required by paragraph (f) of this AD. Repeat the cabin pressurization test at least every 72 months. (1) Within 72 months after the effective date of this AD. (2) Within 72 months since date of issuance of the original airworthiness certificate, or since date of issuance of the export certificate of airworthiness, whichever is first. Corrective Action per Seattle Aircraft Certification Office (ACO) (f) If any discrepancy is found during any inspection or test required by this AD and the service bulletin specifies to contact Boeing for appropriate action: Before further flight, repair per a method approved by the Manager, Seattle ACO, FAA; or per data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved, the approval must specifically reference this AD. Alternative Methods of Compliance (g)(1) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle ACO. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. (2) Alternative methods of compliance, approved previously in accordance with AD 89-12-07, amendment 39-6232, are approved as alternative methods of compliance with paragraph (c)(2) of this AD. Note 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. Special Flight Permits (h) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. Incorporation by Reference (i) Unless otherwise provided in this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin 747-51A2057, dated February 21, 2002. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. Effective Date (j) This amendment becomes effective on July 3, 2003. Issued in Renton, Washington, on May 20, 2003. Ali Bahrami, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 03-13118 Filed 5-28-03; 8:45 am] BILLING CODE 4910-13-P

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1