TrackAD

Airworthiness directives › 2004-25-20

AD 2004-25-20 Airworthiness Directives; Saab Model SAAB 2000 Series Airplanes

2005-01-24
2004-12-20
—
—
Airframe
—

Models named: SAAB 2000 series. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

Model SAAB 2000 series airplanes, certificated in any category, serial numbers -004 through -063 inclusive.

Compliance

Required as indicated, unless accomplished previously. To prevent fatigue cracking of the drag and shear angles of the wing, which could result in reduced structural integrity of the nacelle attachment to the wing, accomplish the following: Repetitive Inspections (a) Do the inspections required by paragraphs (a)(1) and (a)(2) of this AD, at the applicable time specified in paragraph (b) of this AD. (1) Do a detailed inspection for cracking of the shear angles which attach the nacelle to the front spar of the wing, and an eddy current inspection for cracking around the fasteners and in the radii of the shear angles, by doing all the actions per the Accomplishment Instructions of Saab Service Bulletin 2000-54-026, Revision 01, dated June 20, 2002. (2) Do an endoscope inspection of the upper and lower drag angles for cracking, and an eddy current inspection for cracking around the fasteners where applicable, by doing all the actions per the Accomplishment Instructions of Saab Service Bulletin 2000-54-028, Revision 01, dated June 20, 2002. Note 1: For the purposes of this AD, a detailed inspection is defined as: “An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required.” Compliance Times (b) Do the inspections required by paragraph (a) of this AD at the applicable compliance time specified in paragraph (b)(1), (b)(2), or (b)(3) of this AD. Repeat the inspections thereafter at intervals not to exceed 4,000 flight cycles until the modification required by paragraph (e) of this AD is done. (1) For airplanes that have accumulated 14,000 or more total flight cycles as of the effective date of this AD: Inspect within 500 flight cycles after the effective date of this AD. (2) For airplanes that have accumulated 10,000 or more total flight cycles, but fewer than 14,000 total flight cycles as of the effective date of this AD: Inspect within 1,000 flight cycles after the effective date of this AD, but not later then 14,500 total flight cycles. (3) For airplanes that have accumulated fewer than 10,000 total flight cycles as of the effective date of this AD: Inspect within 2,000 flight cycles after the effective date of this AD, but not later then 11,500 total flight cycles. Corrective Action (c) If any cracking is found during any inspection required by this AD: Except as provided by paragraph (f) of this AD, do the actions specified in and at the times specified in Table 1 of the Accomplishment Instructions of Saab Service Bulletin 2000-54-026, Revision 01, dated June 20, 2002; or Saab Service Bulletin 2000-54-028, Revision 01, dated June 20, 2002; as applicable. Where the service bulletins specify to contact the manufacturer, before further flight, repair the cracking in accordance with a method approved by either the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the Luftfartsverket (or its delegated agent). Instead of repairing the cracking, doing the modifications required by paragraph (e) of this AD before further flight, terminates the repetitive inspections required by paragraphs (a) and (b) of this AD. Inspections Done Per Previous Issues of Service Bulletins (d) Inspections done before the effective date of this AD per Saab Service Bulletins 2000-54-026 and 2000-54-028, both dated April 26, 2002, are considered acceptable for compliance with the corresponding actions specified in this AD. Terminating Action (e) Except as provided by paragraph (c) of this AD: Do the modifications of the drag and shear angles of the wing at the times specified in paragraphs (e)(1) and (e)(2) of this AD. Accomplishment of these modifications ends the repetitive inspections required by paragraphs (a) and (b) of this AD. (1) Before the accumulation of 20,000 total flight cycles: Modify the shear angles that attach the nacelle to the front spar of the wing by doing all the actions per the Accomplishment Instructions of Saab Service Bulletin 2000-54-027, dated November 4, 2002. (2) Before the accumulation of 24,000 total flight cycles: Modify the upper and lower drag angles by doing all the actions per the Accomplishment Instructions of Saab Service Bulletin 2000-54-029, dated November 4, 2002. No Reporting Requirement (f) Although the Saab service bulletins referenced in this AD recommend submitting certain information to the manufacturer, this AD does not include such a requirement. Alternative Methods of Compliance (g) In accordance with 14 CFR 39.19, the Manager, International Branch, ANM-116, is authorized to approve alternative methods of compliance for this AD. Incorporation by Reference (h) Unless otherwise specified in this AD, the actions shall be done in accordance with the service bulletins listed in Table 1 of this AD. Table 1.—Service Bulletins Incorporated by Reference Saab service bulletin— Revision level— Date— 2000-54-026 01 June 20, 2002. 2000-54-027 Original November 4, 2002. 2000-54-028 01 June 20, 2002. 2000-54-029 Original November 4, 2002. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Saab Aircraft AB, SAAB Aircraft Product Support, S-581.88, Linköping, Sweden. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Note 2: The subject of this AD is addressed in Swedish airworthiness directives 1-174 and 1-175, both effective April 30, 2002; and Swedish airworthiness directives 1-1180 and 1-181, both effective November 8, 2002. Effective Date (i) This amendment becomes effective on January 24, 2005. Issued in Renton, Washington, on December 6, 2004. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 04-27506 Filed 12-17-04; 8:45 am] BILLING CODE 4910-13-P

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1