Airworthiness directives › 2005-03-01
AD 2005-03-01 Airworthiness Directives; Boeing Model 747 Series Airplanes
Models named: 747 series. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
All Model 747 series airplanes, certificated in any category.
Compliance
Required as indicated, unless accomplished previously. To ensure the structural integrity of the strut-to-wing load path and prevent separation of the strut and engine from the airplane, accomplish the following: Compliance Times (a) Where the compliance times for the initial and repetitive baseline and supplemental inspections in the Accomplishment Instructions of Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001; or Boeing Service Bulletin 747-54A2182, Revision 1, dated January 8, 2004; specify a compliance time interval calculated “from the release of this service bulletin,” this AD requires compliance within the interval specified in the service bulletin “after the effective date of this AD.” Inspections/Follow-On Actions (b) Do the initial and repetitive baseline and supplemental inspections of the nacelle strut-to-wing attachment structure for discrepancies (including cracks, corrosion, or damage; and loose, missing, or broken fasteners), and do the applicable follow-on actions; by doing all the actions in Part 1 through Part 9 of the Work Instructions of Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001. Do the inspections (including inspections for correct installation of hardware and part numbers) and follow-on actions at the applicable times specified in Figure 1 of the service bulletin. (c) Do the initial and repetitive overhauls of the diagonal brace and spring beam load paths by doing all the actions in Part 10 and Part 11 of the Work Instructions of Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001. Do the initial and repetitive overhauls at the applicable times specified in Part 10 and Part 11 of the service bulletin. (d) Do the initial and repetitive inspections of the fuse pins and secondary pins of the strut-to-wing attachment by doing all the actions in Part 12 of the Work Instructions of Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001. Do the inspections at the times specified in Part 12 of the service bulletin. Corrective Actions (e) If any discrepancy is found during any inspection required by this AD: Before further flight, do all applicable corrective actions specified in Part 1 through Part 12 of the Work Instructions of Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001. Do the applicable corrective actions per the service bulletin. If the service bulletin specifies to contact the manufacturer for appropriate action: Before further flight, repair per a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA, or per data meeting the type certification basis of the airplane approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make such findings. Optional Service Bulletin (f) As an option, paragraphs (b) through (e) of this AD may be done in accordance with Part 1 through Part 12, as applicable, of the Work Instructions of Boeing Service Bulletin 747-54A2182, Revision 1, dated January 8, 2004, at the applicable times specified in the service bulletin. If any action specified in paragraphs (b) through (e) of this AD is done in accordance with Revision 1 of the service bulletin, do all of the actions specified in paragraphs (b) through (e) of this AD and the additional actions specified in paragraph (g) of this AD, in accordance with Revision 1 of the service bulletin. If the service bulletin specifies to contact the manufacturer for appropriate action: Before further flight, repair per a method approved by the Manager, Seattle ACO, FAA, or per data meeting the type certification basis of the airplane approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make such findings. Additional Actions for Optional Service Bulletin (g) If, as an option, any action specified in paragraphs (b) through (e) of this AD is done in accordance with Boeing Service Bulletin 747-54A2182, Revision 1, dated January 8, 2004, of the service bulletin, do a detailed inspection of all strut-to-wing attach joints to determine the part number of any dual side link fuse pin; and install the correct fuse pin if any incorrect fuse pin is found; by doing all of the actions specified in the “Initial Base Line Inspection Requirements” of the Work Instructions of Revision 1 of the service bulletin. Do these actions at the applicable times specified in Revision 1 of the service bulletin. Note 1: For the purposes of this AD, a detailed inspection is “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.” No Reporting Requirement (h) Although the service bulletins referenced in this AD specify to submit certain information to the manufacturer, this AD does not include that requirement. Alternative Methods of Compliance (AMOC) (i)(1) In accordance with 14 CFR 39.19, the Manager, Seattle ACO, FAA, is authorized to approve AMOCs for this AD. (2) An AMOC that provides an acceptable level of safety may be used for a repair required by this AD, if it is approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make such findings. Incorporation by Reference (j) Unless otherwise specified in this AD, the actions shall be done in accordance with Boeing Alert Service Bulletin 747-54A2182, dated July 12, 2001. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Effective Date (k) This amendment becomes effective on March 9, 2005. Issued in Renton, Washington, on January 18, 2005. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 05-1724 Filed 2-1-05; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1