Airworthiness directives › 2007-18-52
AD 2007-18-52 Airworthiness Directives; Boeing Model 737-600, -700, -700C, -800, -900, and -900ER Series Airplanes
Models named: 737-600, -700, -700C, -800, -900, -900ER series. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to all Boeing Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes, certificated in any category.
Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. Note 1: Paragraph (f) of this AD merely restates the requirements of paragraph (f)(1) of AD 2007-18-51. As allowed by the phrase, “unless the actions have already been done,” if the applicable initial inspections required by paragraph (f)(1) of AD 2007-18-51 have already been done, this AD does not require that those inspections be repeated until the repetitive interval of 3,000 flight cycles. Repetitive Detailed Inspections: New Initial Compliance Time (f) Within 10 days after the effective date of this AD: Do a detailed inspection or a borescope inspection of each main slat track downstop assembly to verify proper installation of the slat track hardware (i.e., the bolt, washers, downstops, stop location, and nut shown in Figure 1 of Boeing Service Letter 737-SL-57-084-B, dated July 10, 2007, and in this AD). Proper installation of the sleeve need not be confirmed, and the stop location part may be installed on either the inboard or the outboard side of the slat track. If any part is missing or is installed improperly, before further flight, install a new or serviceable part using a method approved in accordance with the procedures specified in paragraph (h) of this AD; and do a detailed inspection of the inside of the slat can for foreign object debris (FOD) and damage. Before further flight, remove any FOD found and repair any damage found using a method approved in accordance with the procedures specified in paragraph (h) of this AD. Using Boeing Multi Operator Message Number 1-523812011-1, issued August 25, 2007; or 1-527463441-1, issued August 28, 2007; is one approved method for verifying proper installation; installing a new or serviceable part; and inspecting for damage and FOD, and removing FOD and repairing damage. Repeat the actions required by paragraph (f) of this AD thereafter at intervals not to exceed 3,000 flight cycles. Note 2: Paragraph (g) of this AD merely restates the requirements of paragraph (f)(2) of AD 2007-18-51. As allowed by the phrase, “unless the actions have already been done,” if the torque application required by paragraph (f)(2) of AD 2007-18-51 has already been done, this AD does not require that the torque application be repeated. One-Time Torquing (g) Within 24 days after receipt of AD 2007-18-51: Apply a torque between 50 to 80 inch-pounds to the nut. The bolt head must be held with the torque applied to the nut. Note 3: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.” BILLING CODE 4910-13-P ER21SE07.042 BILLING CODE 4910-13-C Alternative Methods of Compliance (AMOCs) (h)(1) The Manager, Seattle Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. (2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by an Authorized Representative for the Boeing Commercial Airplanes Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. (4) AMOCs approved previously in accordance with AD 2007-18-51 are approved as AMOCs for the corresponding provisions of this AD. Material Incorporated by Reference (i) None. Issued in Renton, Washington, on September 10, 2007. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E7-18436 Filed 9-20-07; 8:45 am] BILLING CODE 4910-13-P
Unsafe condition
This AD results from additional reports of parts coming off the main slat track downstop assemblies. We are issuing this AD to detect and correct loose or missing parts from the main slat track downstop assemblies, which could result in a fuel leak and consequent fire.
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1