Airworthiness directives › 2008-04-19
AD 2008-04-19 Airworthiness Directives; ATR Model ATR42 and ATR72 Airplanes
Models named: ATR 42-200, -300, -320, -500, ATR 72-101, -201, -102, -202, -211, -212. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to all ATR Model ATR 42-200, -300, -320, and -500 airplanes; and all ATR Model ATR 72-101, -201, -102, -202, -211, -212, and -212A airplanes; certificated in any category. Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections. Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (g) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.
Compliance
Unless already done, do the following actions. (1) Within 3 months after April 3, 2008 (the effective date of AD 2008-04-19), revise the ALS of the ICA to incorporate Task 28.10.00 “Fuel Tank—General,” and Task 28.20.00 “Distribution,” of the Certification Maintenance Requirements (CMR) Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report (MRBR), Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. For all tasks identified in the applicable MRBR, the initial compliance times start from the later of the times specified in paragraphs (f)(1)(i) and (f)(1)(ii) of this AD, except as provided by paragraphs (f)(3) and (g) of this AD. The repetitive inspections must be accomplished thereafter at the interval specified in the applicable MRBR. (i) April 3, 2008. (ii) The date of issuance of the original French standard airworthiness certificate or the date of issuance of the original French export certificate of airworthiness. (2) Within 3 months after April 3, 2008, revise the ALS of the ICA to incorporate the CDCCLs as defined in Section 4., “Critical Design Configuration Control List,” of the Airworthiness Limitations Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 MRBR, Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. (3) For the task titled “Detailed visual inspection of the fuel tanks and associated equipment, wiring, piping and braids” (CMR task reference 28.10.00-1): The initial compliance time is the later of the times specified in paragraphs (f)(3)(i) and (f)(3)(ii) of this AD. Thereafter, the task titled “Detailed visual inspection of the fuel tanks and associated equipment, wiring, piping and braids” must be accomplished at the repetitive interval specified in Section 4., “Critical Design Configuration Control List,” of the Airworthiness Limitations Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 MRBR, Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. (i) Within 144 months since the date of issuance of the original French standard airworthiness certificate or the date of issuance of the original French export certificate of airworthiness. (ii) Within 72 months or 20,000 flight hours after April 3, 2008, whichever occurs first. (4) After accomplishing the actions specified in paragraphs (f)(1), (f)(2), and (f)(3) of this AD, no alternative inspection, inspection intervals, or CDCCLs may be used unless the inspections, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC), in accordance with the procedures specified in paragraph (g) of this AD. New Information Explanation of CDCCL Requirements Note 2: Notwithstanding any other maintenance or operational requirements, components that have been identified as airworthy or installed on the affected airplanes before the revision of the ALS, as required by paragraph (f) of this AD, do not need to be reworked in accordance with the CDCCLs. However, once the ALS has been revised, future maintenance actions on these components must be done in accordance with the CDCCLs. FAA AD Differences Note 3: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Tom Rodriguez, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1137; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to ensure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2006-0219R1, dated June 29, 2007, and the service information identified in Table 1 of this AD, for related information. Table 1—Service Information Document Revision level Date Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report 7 March 31, 2006. Time Limits Section of Part 1 of the ATR 42-400/-500 Maintenance Review Board Report 6 March 26, 2007. Time Limits Section of Part 1 of the ATR 72 Maintenance Review Board Report 8 March 26, 2007. Material Incorporated by Reference (i) You must use the applicable service information contained in Table 2 of this AD to do the actions required by this AD, unless the AD specifies otherwise. Table 2—Material Incorporated by Reference Document Revision level Date Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report 7 March 31, 2006. Time Limits Section of Part 1 of the ATR 42-400/-500 Maintenance Review Board Report 6 March 26, 2007. Time Limits Section of Part 1 of the ATR 72 Maintenance Review Board Report 8 March 26, 2007. (1) The Director of the Federal Register previously approved the incorporation by reference of this service information on April 3, 2008 (73 FR 10652, February 28, 2008). (2) For service information identified in this AD, contact ATR—GIE Avions de Transport Régional, 1, Allée Pierre Nadot, 31712 Blagnac Cedex, France; telephone +33 (0) 5 62 21 62 21; fax +33 (0) 5 62 21 67 18; e-mail continued.airworthiness@atr.fr; Internet http://www.aerochain.com. (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington, on October 22, 2009. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E9-26289 Filed 11-2-09; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions. (1) Within 3 months after April 3, 2008 (the effective date of AD 2008-04-19), revise the ALS of the ICA to incorporate Task 28.10.00 “Fuel Tank—General,” and Task 28.20.00 “Distribution,” of the Certification Maintenance Requirements (CMR) Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report (MRBR), Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. For all tasks identified in the applicable MRBR, the initial compliance times start from the later of the times specified in paragraphs (f)(1)(i) and (f)(1)(ii) of this AD, except as provided by paragraphs (f)(3) and (g) of this AD. The repetitive inspections must be accomplished thereafter at the interval specified in the applicable MRBR. (i) April 3, 2008. (ii) The date of issuance of the original French standard airworthiness certificate or the date of issuance of the original French export certificate of airworthiness. (2) Within 3 months after April 3, 2008, revise the ALS of the ICA to incorporate the CDCCLs as defined in Section 4., “Critical Design Configuration Control List,” of the Airworthiness Limitations Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 MRBR, Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. (3) For the task titled “Detailed visual inspection of the fuel tanks and associated equipment, wiring, piping and braids” (CMR task reference 28.10.00-1): The initial compliance time is the later of the times specified in paragraphs (f)(3)(i) and (f)(3)(ii) of this AD. Thereafter, the task titled “Detailed visual inspection of the fuel tanks and associated equipment, wiring, piping and braids” must be accomplished at the repetitive interval specified in Section 4., “Critical Design Configuration Control List,” of the Airworthiness Limitations Section of the Time Limits Section of Part 1 of the ATR 42-200/-300/-320 MRBR, Revision 7, dated March 31, 2006; the ATR 42-400/-500 MRBR, Revision 6, dated March 26, 2007; or the ATR 72 MRBR, Revision 8, dated March 26, 2007; as applicable. (i) Within 144 months since the date of issuance of the original French standard airworthiness certificate or the date of issuance of the original French export certificate of airworthiness. (ii) Within 72 months or 20,000 flight hours after April 3, 2008, whichever occurs first. (4) After accomplishing the actions specified in paragraphs (f)(1), (f)(2), and (f)(3) of this AD, no alternative inspection, inspection intervals, or CDCCLs may be used unless the inspections, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC), in accordance with the procedures specified in paragraph (g) of this AD. New Information Explanation of CDCCL Requirements Note 2: Notwithstanding any other maintenance or operational requirements, components that have been identified as airworthy or installed on the affected airplanes before the revision of the ALS, as required by paragraph (f) of this AD, do not need to be reworked in accordance with the CDCCLs. However, once the ALS has been revised, future maintenance actions on these components must be done in accordance with the CDCCLs. FAA AD Differences Note 3: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Tom Rodriguez, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1137; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to ensure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2006-0219R1, dated June 29, 2007, and the service information identified in Table 1 of this AD, for related information. Table 1—Service Information Document Revision level Date Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report 7 March 31, 2006. Time Limits Section of Part 1 of the ATR 42-400/-500 Maintenance Review Board Report 6 March 26, 2007. Time Limits Section of Part 1 of the ATR 72 Maintenance Review Board Report 8 March 26, 2007. Material Incorporated by Reference (i) You must use the applicable service information contained in Table 2 of this AD to do the actions required by this AD, unless the AD specifies otherwise. Table 2—Material Incorporated by Reference Document Revision level Date Time Limits Section of Part 1 of the ATR 42-200/-300/-320 Maintenance Review Board Report 7 March 31, 2006. Time Limits Section of Part 1 of the ATR 42-400/-500 Maintenance Review Board Report 6 March 26, 2007. Time Limits Section of Part 1 of the ATR 72 Maintenance Review Board Report 8 March 26, 2007. (1) The Director of the Federal Register previously approved the incorporation by reference of this service information on April 3, 2008 (73 FR 10652, February 28, 2008). (2) For service information identified in this AD, contact ATR—GIE Avions de Transport Régional, 1, Allée Pierre Nadot, 31712 Blagnac Cedex, France; telephone +33 (0) 5 62 21 62 21; fax +33 (0) 5 62 21 67 18; e-mail continued.airworthiness@atr.fr; Internet http://www.aerochain.com. (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington, on October 22, 2009. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E9-26289 Filed 11-2-09; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1