TrackAD

Airworthiness directives › 2008-05-18

AD 2008-05-18 Airworthiness Directives; Fokker Model F.27 Mark 050, 200, 300, 400, 500, 600, and 700 Airplanes

Superseded. This directive was replaced by AD 2016-12-12. Work to the current one.
2009-11-23
2009-11-06
—
—
Airframe
2016-12-12

Models named: F.27 Mark 050. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to Fokker Model F.27 Mark 050 airplanes, all serial numbers; and Fokker F.27 Mark 200, 300, 400, 500, 600, and 700 airplanes, serial numbers 10102 through 10692 inclusive; certificated in any category. Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections. Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (g)(1) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.

Compliance

Unless already done, do the following actions. (1) Within 3 months after April 16, 2008 (the effective date of AD 2008-05-18), revise the ALS of the Instructions for Continued Airworthiness to incorporate the limits (inspections, thresholds, and intervals) specified in Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable. For all tasks identified in Report SE-671 or Service Bulletin SBF27-28-070, the initial compliance times are as specified in Table 1 or Table 2 of this AD, as applicable. The repetitive inspections must be accomplished thereafter at the intervals specified in Report SE-671 or Service Bulletin SBF27-28-070, as applicable, except as provided by paragraphs (f)(3) and (g)(1) of this AD. Table 1—Initial Compliance Times for ALS Revision for Model F.27 Mark 050 Airplanes For— The later of— Task 280000-01 102 months after April 16, 2008; or 102 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Task 280000-02 30 months after April 16, 2008; or 30 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Table 2—Initial Compliance Times for ALS Revision for Model F.27 Mark 200, 300, 400, 500, 600, and 700 Airplanes For— The later of— Task 280000-01 78 months after April 16, 2008; or 78 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Task 280000-02 18 months after April 16, 2008; or 18 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. (2) Within 3 months after April 16, 2008, revise the ALS of the Instructions for Continued Airworthiness to incorporate the CDCCLs as defined in Fokker 50/60 Fuel Airworthiness Limitations Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable. (3) Where Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable; allow for exceptional short-term extensions, an exception is acceptable to the FAA if it is approved by the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. (4) After accomplishing the actions specified in paragraphs (f)(1) and (f)(2) of this AD, no alternative inspections, inspection intervals, or CDCCLs may be used, unless the inspections, inspection intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (g)(1) of this AD. (5) Actions done before April 16, 2008, in accordance with Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 1, dated January 31, 2006; and Fokker Service Bulletin SBF27/28-070, dated June 30, 2006; are acceptable for compliance with the corresponding requirements of this AD. New Information: Explanation of CDCCL Requirements Note 2: Notwithstanding any other maintenance or operational requirements, components that have been identified as airworthy or installed on the affected airplanes before the revision of the ALS of the Instructions for Continued Airworthiness, as required by paragraphs (f)(1) and (f)(2) of this AD, do not need to be reworked in accordance with the CDCCLs. However, once the ALS has been revised, future maintenance actions on these components must be done in accordance with the CDCCLs. FAA AD Differences Note 3: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Tom Rodriguez, Aerospace Engineer, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1137; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to ensure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2006-0207, dated July 12, 2006; EASA Airworthiness Directive 2006-0209, dated July 12, 2006 (corrected September 1, 2006); Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; for related information. Material Incorporated by Reference (i) You must use Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable; to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register previously approved the incorporation by reference of Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; on April 16, 2008 (73 FR 13071, March 12, 2008). (2) For service information identified in this AD, contact Fokker Services B.V., Technical Services Dept., P.O. Box 231, 2150 AE Nieuw-Vennep, the Netherlands; telephone +31 (0)252-627-350; fax +31 (0)252-627-211; e-mail technicalservices.fokkerservices@stork.com; Internet http://www.myfokkerfleet.com. (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington, on October 26, 2009. Stephen P. Boyd, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E9-26382 Filed 11-5-09; 8:45 am] BILLING CODE 4910-13-P

Required actions

Unless already done, do the following actions. (1) Within 3 months after April 16, 2008 (the effective date of AD 2008-05-18), revise the ALS of the Instructions for Continued Airworthiness to incorporate the limits (inspections, thresholds, and intervals) specified in Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable. For all tasks identified in Report SE-671 or Service Bulletin SBF27-28-070, the initial compliance times are as specified in Table 1 or Table 2 of this AD, as applicable. The repetitive inspections must be accomplished thereafter at the intervals specified in Report SE-671 or Service Bulletin SBF27-28-070, as applicable, except as provided by paragraphs (f)(3) and (g)(1) of this AD. Table 1—Initial Compliance Times for ALS Revision for Model F.27 Mark 050 Airplanes For— The later of— Task 280000-01 102 months after April 16, 2008; or 102 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Task 280000-02 30 months after April 16, 2008; or 30 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Table 2—Initial Compliance Times for ALS Revision for Model F.27 Mark 200, 300, 400, 500, 600, and 700 Airplanes For— The later of— Task 280000-01 78 months after April 16, 2008; or 78 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. Task 280000-02 18 months after April 16, 2008; or 18 months after the date of issuance of the original Dutch standard airworthiness certificate or the date of issuance of the original Dutch export certificate of airworthiness. (2) Within 3 months after April 16, 2008, revise the ALS of the Instructions for Continued Airworthiness to incorporate the CDCCLs as defined in Fokker 50/60 Fuel Airworthiness Limitations Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable. (3) Where Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; or Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable; allow for exceptional short-term extensions, an exception is acceptable to the FAA if it is approved by the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. (4) After accomplishing the actions specified in paragraphs (f)(1) and (f)(2) of this AD, no alternative inspections, inspection intervals, or CDCCLs may be used, unless the inspections, inspection intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (g)(1) of this AD. (5) Actions done before April 16, 2008, in accordance with Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 1, dated January 31, 2006; and Fokker Service Bulletin SBF27/28-070, dated June 30, 2006; are acceptable for compliance with the corresponding requirements of this AD. New Information: Explanation of CDCCL Requirements Note 2: Notwithstanding any other maintenance or operational requirements, components that have been identified as airworthy or installed on the affected airplanes before the revision of the ALS of the Instructions for Continued Airworthiness, as required by paragraphs (f)(1) and (f)(2) of this AD, do not need to be reworked in accordance with the CDCCLs. However, once the ALS has been revised, future maintenance actions on these components must be done in accordance with the CDCCLs. FAA AD Differences Note 3: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Tom Rodriguez, Aerospace Engineer, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1137; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to ensure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2006-0207, dated July 12, 2006; EASA Airworthiness Directive 2006-0209, dated July 12, 2006 (corrected September 1, 2006); Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; for related information. Material Incorporated by Reference (i) You must use Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; as applicable; to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register previously approved the incorporation by reference of Fokker 50/60 Fuel Airworthiness Limitation Items (ALI) and Critical Design Configuration Control Limitations (CDCCL) Report SE-671, Issue 2, dated December 1, 2006; and Fokker Service Bulletin SBF27-28-070, Revision 1, dated January 8, 2008; on April 16, 2008 (73 FR 13071, March 12, 2008). (2) For service information identified in this AD, contact Fokker Services B.V., Technical Services Dept., P.O. Box 231, 2150 AE Nieuw-Vennep, the Netherlands; telephone +31 (0)252-627-350; fax +31 (0)252-627-211; e-mail technicalservices.fokkerservices@stork.com; Internet http://www.myfokkerfleet.com. (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington, on October 26, 2009. Stephen P. Boyd, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E9-26382 Filed 11-5-09; 8:45 am] BILLING CODE 4910-13-P

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1