Airworthiness directives › 2008-11-07
AD 2008-11-07 Airworthiness Directives; Boeing Model 757 Airplanes
Models named: 757-200, -200CB, -200PF, -300 series. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to all Boeing Model 757-200, -200CB, -200PF, and -300 series airplanes, certificated in any category. Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections of the automatic shutoff system for the center tank fuel boost pumps. Compliance with these inspections is required by 14 CFR 43.16 and 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (r) of this AD. The request should include a description of changes to the required inspections that will ensure acceptable maintenance of the automatic shutoff system.
Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. Service Bulletin References (f) The term “service bulletin,” as used in this AD, means the Accomplishment Instructions of the service bulletins identified in Table 1 of this AD, as applicable. Table 1.—Service Bulletin References Airplanes Action Service Bulletin Model 757-200, -200CB, and -200PF series airplanes Installation specified in paragraph (g) of this AD Boeing Alert Service Bulletin 757-28A0081, dated February 16, 2006. Model 757-300 series airplanes Installation specified in paragraph (g) of this AD Boeing Alert Service Bulletin 757-28A0082, dated February 16, 2006. For Model 757-200, -200CB, -200PF, and -300 series airplanes Installation specified in paragraph (k) of this AD Boeing Service Bulletin 757-28A0105, Revision 1, dated April 2, 2007. Installation of Automatic Shutoff System for the Center Tank Fuel Boost Pumps (g) Within 36 months after the effective date of this AD: Install an automatic shutoff system for the center tank fuel boost pumps, by accomplishing all of the actions specified in the applicable service bulletin. If a placard has been previously installed on the airplane in accordance with paragraph (h) of this AD, the placard may be removed from the flight deck of only that airplane after the automatic shutoff system has been installed. Installing automatic shutoff systems on all airplanes in an operator's fleet, in accordance with this paragraph, terminates the placard installation required by paragraph (h) of this AD, for all airplanes in an operator's fleet. Placard Installation for Mixed Fleet Operation (h) Concurrently with installing an automatic shutoff system on any airplane in an operator's fleet, as required by paragraph (g) of this AD: Install a placard adjacent to the pilot's primary flight display on all airplanes in the operator's fleet not equipped with an automatic shutoff system for the center tank fuel boost pumps. The placard reads as follows (alternative placard wording may be used if approved by an appropriate FAA Principal Operations Inspector): “AD 2002-24-51 fuel usage restrictions required.” Installation of a placard in accordance with paragraph (e) of AD 2002-19-52, amendment 39-12900, is acceptable for compliance with the requirements of this paragraph. Installing an automatic shutoff system on an airplane, in accordance with paragraph (g) of this AD, terminates the placard installation required by this paragraph, for only that airplane. Installing automatic shutoff systems on all airplanes in an operator's fleet, in accordance with paragraph (g) of this AD, terminates the placard installation required by this paragraph, for all airplanes in an operator's fleet. If automatic shutoff systems are installed concurrently on all airplanes in an operator's fleet in accordance with paragraph (g) of this AD, or if operation according to the fuel usage restrictions of AD 2002-24-51 is maintained until automatic shutoff systems are installed on all airplanes in an operator's fleet, the placard installation specified in this paragraph is not required. Airplane Flight Manual (AFM) Revision (i) Concurrently with accomplishing the actions required by paragraph (g) of this AD: Do the actions specified in paragraphs (i)(1) and (i)(2) of this AD. (1) Revise Section 1 of the Limitations section of the Boeing 757 AFM to include the following statement. This may be done by inserting a copy of this AD in the AFM. “Intentional dry running of a center tank fuel pump (CTR L FUEL PUMP or CTR R FUEL PUMP message displayed on EICAS) is prohibited.” Note 2: When a statement identical to that in paragraph (i)(1) of this AD has been included in the general revisions of the AFM, the general revisions may be inserted into the AFM, and the copy of this AD may be removed from the AFM. (2) Revise Section 3.1 of the Normal Procedures section of the Boeing 757 AFM to include the following statements. This may be done by inserting a copy of this AD in the AFM. “Procedures contained on this page are applicable to airplanes equipped with the automatic center tank fuel pump power removal system per Boeing Service Bulletin 757-28A0081 (757-200 Series) or 757-28A0082 (757-300 Series). CENTER TANK FUEL PUMPS Center tank fuel pump switches must not be “ON” unless personnel are available in the flight deck to monitor low PRESS lights. For ground operations prior to engine start: The center tank fuel pump switches must not be positioned ON unless the center tank contains usable fuel. With center tank fuel pump switches ON, verify both center tank fuel pump low PRESS lights are illuminated and EICAS CTR L FUEL PUMP and CTR R FUEL PUMP messages are displayed. For ground operations after engine start and flight operations: The center tank fuel pump switch must be selected OFF when the respective CTR L FUEL PUMP or CTR R FUEL PUMP message displays. Both center tank fuel pump switches must be selected OFF when either the CTR L FUEL PUMP or CTR R FUEL PUMP message displays if the center tank is empty. During cruise flight, both center tank pump switches may be reselected ON whenever center tank usable fuel is indicated. DE-FUELING AND FUEL TRANSFER When transferring fuel or de-fueling center or main wing tanks, the center fuel pump low PRESS must be monitored and the fuel pump switches positioned to “OFF' at the first indication of low pressure. Prior to transferring fuel or de-fueling, conduct a lamp test of the respective fuel pump low PRESS lights. De-fueling main wing tanks with passengers onboard is prohibited if main tank fuel pumps are powered. De-fueling center wing tank with passengers onboard is prohibited if the center wing tank fuel pumps are powered with the automatic center tank fuel pump power removal system inhibited. Fuel may be transferred from tank to tank, or the aircraft may be de-fueled with passengers onboard, provided fuel quantity in the tank from which fuel is being transferred from is maintained above 2,000 pounds (900 kilograms).” Note 3: When statements identical to those in paragraph (i)(2) of this AD have been included in the general revisions of the AFM, the general revisions may be inserted into the AFM, and the copy of this AD may be removed from the AFM. Airworthiness Limitations (AWLs) Revision for AWL No. 28-AWL-20 (j) Concurrently with accomplishing the actions required by paragraph (g) of this AD: Revise the AWLs section of the Instructions for Continued Airworthiness (ICA) by incorporating AWL No. 28-AWL-20 of Subsection G of Section 9 of the Boeing 757 Maintenance Planning Data (MPD) Document, D622N001-9, Revision January 2006, into the MPD. Accomplishing the revision in accordance with a later revision of the MPD is an acceptable method of compliance if the revision is approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. Installation of Secondary Override Pump Control Relays (k) Within 60 months after the effective date of this AD: Replace fuel control panel assembly part number 233N3206-( ) (equipment number M10055) with a modified fuel control assembly, install the secondary override pump control relays for the center tank fuel pumps in the P33 and P37 relay panels, and do all other specified actions as applicable, by accomplishing all of the applicable actions specified in the applicable service bulletin. The other specified actions must be accomplished before further flight after installing the secondary override pump control relays. Concurrent Modification of the M10055 Fuel Control Panel Assembly (l) For airplanes identified in paragraph 1.A.1. of Boeing Service Bulletin 757-28A0105, Revision 1, dated April 2, 2007, equipped with any fuel control panel assembly identified in paragraph 1.A. of BAE Systems Service Bulletin 233N3206-28-03, dated October 4, 2006: Before or concurrently with accomplishing the actions required by paragraph (k) of this AD, modify the fuel control panel assembly, in accordance with BAE Systems Service Bulletin 233N3206-28-03, dated October 4, 2006. AWLs Revision for AWL No. 28-AWL-26 (m) Before or concurrently with accomplishing the actions required by paragraph (k) of this AD: Revise the AWLs section of the ICA by incorporating AWL No. 28-AWL-26 of Boeing Temporary Revision (TR) 09-006, dated January 2007, into the MPD. Boeing TR 09-006 is published as Section 9 of the Boeing 757 MPD Document, D622N001-9, Revision January 2007. Accomplishing the revision in accordance with a later revision of the MPD is an acceptable method of compliance if the revision is approved by the Manager, Seattle ACO. Terminating Action for AD 2002-24-51 (n) Accomplishing the actions required by paragraphs (g), (h), (i), and (j) of this AD terminates the AFM limitations required by paragraph (e) of AD 2002-24-51 for Model 757-200, -200CB, -200PF, and -300 series airplanes that have the automatic shutoff system installed, except for the following limitation: “Warning Do not reset a tripped fuel pump circuit breaker.” Except for this limitation, all other AFM limitations required by paragraph (e) of AD 2002-24-51 for Model 757-200, -200CB, -200PF, and -300 series airplanes may be removed from the AFM after accomplishing the actions required by paragraphs (g), (h), (i), and (j) of this AD. Credit for Actions Done According to Previous Issue of Service Bulletin (o) Actions accomplished before the effective date of this AD in accordance with Boeing Alert Service Bulletin 757-28A0105, dated January 31, 2007, are considered acceptable for compliance with the corresponding actions specified in paragraph (k) of this AD. Terminating Action for Certain Airplanes (p) For Model 757-200 and -300 series airplanes: Installing and maintaining TDG Aerospace, Inc. Universal Fault Interrupter (UFI), in accordance with Supplemental Type Certificate (STC) ST01950LA, terminates the actions required by paragraphs (g) through (m) of this AD; provided that, concurrently with installing a UFI on any airplane in an operator's fleet, a placard is installed adjacent to the pilot's primary flight display on all airplanes in the operator's fleet not equipped with a UFI. The placard reads as follows (alternative placard wording may be used if approved by an appropriate FAA Principal Operations Inspector): “AD 2002-24-51 fuel usage restrictions required.” Installation of a placard in accordance with paragraph (e) of AD 2002-19-52 or paragraph (h) of this AD is acceptable for compliance with the placard installation required by this paragraph. Installing a UFI in accordance with STC ST01950LA, or an automatic shutoff system in accordance with paragraph (g) of this AD, on an airplane terminates the placard installation required by this paragraph for only that airplane. Installing UFIs in accordance with STC ST01950LA, or automatic shutoff systems in accordance with paragraph (g) of this AD, on all airplanes in an operator's fleet terminates the placard installation required by this paragraph for all airplanes in an operator's fleet. If UFIs or automatic shutoff systems are installed concurrently on all airplanes in an operator's fleet, or if operation according to the fuel usage restrictions of AD 2002-24-51 is maintained until UFIs or automatic shutoff systems are installed on all airplanes in an operator's fleet, the placard installation specified in this paragraph is not required. Terminating Action for AWLs Revision (q) Incorporating AWLs No. 28-AWL-20 and No. 28-AWL-26 into the AWLs section of the ICA in accordance with paragraph (g)(3) of AD 2008-10-11 terminates the corresponding action required by paragraphs (j) and (m) of this AD. Alternative Methods of Compliance (AMOCs) (r)(1) The Manager, Seattle ACO, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. (2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. Material Incorporated by Reference (s) You must use the service information contained in Table 2 of this AD to do the actions required by this AD, as applicable, unless the AD specifies otherwise. Table 2.—Material Incorporated by Reference Service information Revision Date BAE Systems Service Bulletin 233N3206-28-03 Original October 4, 2006. Boeing Alert Service Bulletin 757-28A0081 Original February 16, 2006. Boeing Alert Service Bulletin 757-28A0082 Original February 16, 2006. Boeing Service Bulletin 757-28A0105 1 April 2, 2007. Boeing 757 Maintenance Planning Data Document, D622N001-9, Section 9, Subsection G January 2006 January 2006. Boeing Temporary Revision 09-006 to the Boeing 757 Maintenance Planning Data Document, D622N001-9. Boeing Temporary Revision 09-006 is published as Section 9 of the Boeing 757 Maintenance Planning Data Document, D622N001-9, Revision January 2007 Original January 2007. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. (3) You may review copies of the service information that is incorporated by reference at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Issued in Renton, Washington, on May 8, 2008. Michael J. Kaszycki, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8-11275 Filed 5-28-08; 8:45 am] BILLING CODE 4910-13-P
Unsafe condition
This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent center tank fuel pump operation with continuous low pressure, which could lead to friction sparks or overheating in the fuel pump inlet that could create a potential ignition source inside the center fuel tank; these conditions, in combination with flammable fuel vapors, could result in a center fuel tank explosion and consequent loss of the airplane.
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1