Airworthiness directives › 2008-13-15
AD 2008-13-15 Airworthiness Directives; Empresa Brasileira de Aeronautica S.A. (EMBRAER) Model EMB-135BJ Airplanes
Models named: EMB-135BJ. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to all EMBRAER Model EMB-135BJ airplanes, certificated in any category. Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections. Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (g) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.
Compliance
Unless already done, do the following actions. (1) The term “MPG,” as used in this AD, means the EMBRAER Legacy BJ—Maintenance Planning Guide (MPG) MPG-1483, Revision 5, dated March 22, 2007. (2) Before December 16, 2008, revise the ALS of the ICA to incorporate Section A2.5.2, Fuel System Limitation Items, of Appendix 2 of the MPG. For all tasks identified in Section A2.5.2 of Appendix 2 of the MPG, the initial compliance times start from the applicable times specified in Table 1 of this AD; and the repetitive inspections must be accomplished thereafter at the interval specified in section A2.5.2 of Appendix 2 of the MPG, except as provided by paragraphs (f)(4) and (g) of this AD. Table 1—Initial Inspections Reference number Description Compliance time (whichever occurs later) Threshold Grace period 28-11-00-720-001-A00 Functionally Check critical bonding integrity of selected conduits inside the wing tank, Fuel Pump and FQIS connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-13-01-720-002-A00 Functionally Check Aft Fuel tank critical bonding integrity of Fuel Pump, FQGS and Low Level SW connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-15-04-720-001-A00 Functionally Check Fwd Fuel tank critical bonding integrity of Fuel Pump, FQGS and Low Level SW connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-21-01-220-001-A00 Inspect Wing Electric Fuel Pump Connector Before the accumulation of 10,000 total flight hours Within 90 days after December 16, 2008D 28-23-03-220-001-A00 Inspect Pilot Valve harness inside the conduit Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-23-04-220-001-A00 Inspect Vent Valve harness inside the conduit Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-41-03-220-001-A00 Inspect FQIS harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-46-02-220-001-A00 Aft Fuel Tank Internal Inspection: FQGS harness and Low Level SW harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-46-04-220-001-A00 Fwd Fuel Tank Internal Inspection: FQGS harness and Low Level SW harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 (3) Before December 16, 2008, or within 90 days after the effective date of this AD, whichever occurs first, revise the ALS of the ICA to incorporate items 1, 2, and 3 of Section A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of the MPG. (4) After accomplishing the actions specified in paragraphs (f)(2) and (f)(3) of this AD, no alternative inspections, inspection intervals, or CDCCLs may be used unless the inspections, intervals, or CDCCLs are part of a later revision of Appendix 2 of the MPG that is approved by the Manager, ANM-116, FAA, or ANAC (or its delegated agent); or unless the inspections, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (g) of this AD. FAA AD Differences Note 2: This AD differs from the MCAI and/or service information as follows: (1) The MCAI specifies a compliance date of “Before December 31, 2008” for doing the ALI revisions. We have already issued regulations that require operators to revise their maintenance/inspection programs to address fuel tank safety issues. The compliance date for these regulations is December 16, 2008. To provide for coordinated implementation of these regulations and this AD, we are using this same compliance date in this AD. (2) The MCAI specifies a compliance time of 180 days to revise the ALS of the ICA to incorporate items 1, 2, and 3 of Section A2.4 of Appendix 2 of the MPG. This AD requires a compliance time of 90 days to do this revision. This difference has been coordinated with ANAC. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Sanjay Ralhan, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1405; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to Brazilian Airworthiness Directive 2007-08-01, effective September 27, 2007; and Sections A2.5.2, Fuel System Limitation Items, and A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of the MPG; for related information. Material Incorporated by Reference (i) You must use Sections A2.5.2, Fuel System Limitation Items, and A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of EMBRAER Legacy BJ—Maintenance Planning Guide MPG-1483, Revision 5, dated March 22, 2007, to do the actions required by this AD, unless the AD specifies otherwise. This document contains the following effective pages: Pages Revision level Date List of Effective Pages: Pages A through J 5 March 22, 2007. (The revision level of this document is identified only on the title page of the document.) (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343—CEP 12.225, Sao Jose dos Campos—SP, Brazil. (3) You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html . Issued in Renton, Washington, on June 13, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8-13926 Filed 6-24-08; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions. (1) The term “MPG,” as used in this AD, means the EMBRAER Legacy BJ—Maintenance Planning Guide (MPG) MPG-1483, Revision 5, dated March 22, 2007. (2) Before December 16, 2008, revise the ALS of the ICA to incorporate Section A2.5.2, Fuel System Limitation Items, of Appendix 2 of the MPG. For all tasks identified in Section A2.5.2 of Appendix 2 of the MPG, the initial compliance times start from the applicable times specified in Table 1 of this AD; and the repetitive inspections must be accomplished thereafter at the interval specified in section A2.5.2 of Appendix 2 of the MPG, except as provided by paragraphs (f)(4) and (g) of this AD. Table 1—Initial Inspections Reference number Description Compliance time (whichever occurs later) Threshold Grace period 28-11-00-720-001-A00 Functionally Check critical bonding integrity of selected conduits inside the wing tank, Fuel Pump and FQIS connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-13-01-720-002-A00 Functionally Check Aft Fuel tank critical bonding integrity of Fuel Pump, FQGS and Low Level SW connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-15-04-720-001-A00 Functionally Check Fwd Fuel tank critical bonding integrity of Fuel Pump, FQGS and Low Level SW connectors at tank wall by conductivity measurements Before the accumulation of 30,000 total flight hours Within 90 days after December 16, 2008 28-21-01-220-001-A00 Inspect Wing Electric Fuel Pump Connector Before the accumulation of 10,000 total flight hours Within 90 days after December 16, 2008D 28-23-03-220-001-A00 Inspect Pilot Valve harness inside the conduit Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-23-04-220-001-A00 Inspect Vent Valve harness inside the conduit Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-41-03-220-001-A00 Inspect FQIS harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-46-02-220-001-A00 Aft Fuel Tank Internal Inspection: FQGS harness and Low Level SW harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 28-46-04-220-001-A00 Fwd Fuel Tank Internal Inspection: FQGS harness and Low Level SW harness for clamp and wire jacket integrity Before the accumulation of 20,000 total flight hours Within 90 days after December 16, 2008 (3) Before December 16, 2008, or within 90 days after the effective date of this AD, whichever occurs first, revise the ALS of the ICA to incorporate items 1, 2, and 3 of Section A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of the MPG. (4) After accomplishing the actions specified in paragraphs (f)(2) and (f)(3) of this AD, no alternative inspections, inspection intervals, or CDCCLs may be used unless the inspections, intervals, or CDCCLs are part of a later revision of Appendix 2 of the MPG that is approved by the Manager, ANM-116, FAA, or ANAC (or its delegated agent); or unless the inspections, intervals, or CDCCLs are approved as an alternative method of compliance (AMOC) in accordance with the procedures specified in paragraph (g) of this AD. FAA AD Differences Note 2: This AD differs from the MCAI and/or service information as follows: (1) The MCAI specifies a compliance date of “Before December 31, 2008” for doing the ALI revisions. We have already issued regulations that require operators to revise their maintenance/inspection programs to address fuel tank safety issues. The compliance date for these regulations is December 16, 2008. To provide for coordinated implementation of these regulations and this AD, we are using this same compliance date in this AD. (2) The MCAI specifies a compliance time of 180 days to revise the ALS of the ICA to incorporate items 1, 2, and 3 of Section A2.4 of Appendix 2 of the MPG. This AD requires a compliance time of 90 days to do this revision. This difference has been coordinated with ANAC. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Sanjay Ralhan, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1405; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to Brazilian Airworthiness Directive 2007-08-01, effective September 27, 2007; and Sections A2.5.2, Fuel System Limitation Items, and A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of the MPG; for related information. Material Incorporated by Reference (i) You must use Sections A2.5.2, Fuel System Limitation Items, and A2.4, Critical Design Configuration Control Limitation (CDCCL), of Appendix 2 of EMBRAER Legacy BJ—Maintenance Planning Guide MPG-1483, Revision 5, dated March 22, 2007, to do the actions required by this AD, unless the AD specifies otherwise. This document contains the following effective pages: Pages Revision level Date List of Effective Pages: Pages A through J 5 March 22, 2007. (The revision level of this document is identified only on the title page of the document.) (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343—CEP 12.225, Sao Jose dos Campos—SP, Brazil. (3) You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html . Issued in Renton, Washington, on June 13, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8-13926 Filed 6-24-08; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1