Airworthiness directives › 2008-23-02
AD 2008-23-02 Airworthiness Directives; Saab Model SAAB 2000 Airplanes
Models named: SAAB 2000. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to Saab Model SAAB 2000 airplanes, certificated in any category, serial number 004 through 063.
Compliance
Unless already done, do the following actions. (1) Within 1,000 flight hours after the effective date of this AD, do visual inspections of both the aft engine mounting assemblies to find if the center bracket is correct (no sharp edges) from the manufacturer. (2) If no sharp edge is found during the inspection required by paragraph (f)(1) of this AD, before further flight, inspect to determine if the aft engine mounting assembly and center bracket are identified with a “-1,” and before further flight re-identify the parts that are not identified with a “-1,” in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. Following the re-identification, no further action is required by this AD for airplanes on which no sharp edge is found during the inspection required by paragraph (f)(1) of this AD. (3) If any sharp edge is found during the inspection required by paragraph (f)(1) of this AD, before further flight, do the action in paragraph (f)(3)(i) or (f)(3)(ii) of this AD in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. (i) Do a general visual inspection for cracking of the center bracket of both of the aft engine mounting assemblies, with the bracket on the wing, and repeat the inspection thereafter at intervals not to exceed 250 flight hours until the action required by paragraph (f)(4) of this AD is accomplished. (ii) Do general visual and penetrant inspections for cracking of the center bracket of both of the aft engine mounting assemblies, with the bracket off the wing. Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.” (4) At the applicable time in paragraph (f)(4)(i) or (f)(4)(ii) of this AD, do the applicable actions in those paragraphs in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. Doing the applicable action terminates the repetitive inspection requirements of paragraph (f)(3)(i) of this AD. (i) If no cracking is found during any inspection required by paragraph (f)(3) of this AD: Within 4,000 flight hours after the effective date of this AD, rework the center bracket, and re-identify the aft engine mounting assembly and center bracket. (ii) If any cracking is found during any inspection required by paragraph (f)(3) of this AD, before further flight, replace the aft engine mounting assembly with an assembly and bracket identified with a “-1” part number. (5) Actions done before the effective date of this AD in accordance with Saab Service Bulletin 2000-71-023, Revision 01, dated June 13, 2007, are acceptable for compliance with the corresponding requirements of paragraph (f)(3) of this AD. FAA AD Differences Note 2: This AD differs from the MCAI and/or service information as follows: Although the MCAI or service information allows further flight after cracks are found during compliance with the required action, paragraph (f)(4) of this AD requires that you replace a cracked aft engine mounting assembly before further flight. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Shahram Daneshmandi, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1112; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2008-0068, dated April 11, 2008; and Saab Service Bulletin 2000-71-025, dated June 13, 2007; for related information. Material Incorporated by Reference (i) You must use Saab Service Bulletin 2000-71-025, dated June 13, 2007, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Saab Aircraft AB, SAAB Aircraft Product Support, S-581.88, Linköping, Sweden; telephone 011 46 13 18 5591; fax 011 46 13 18 4874; e-mail http://www.saab2000.techsupport@saabgroup.com ; Internet http://www.saabgroup.com . (3) You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Issued in Renton, Washington, on October 24, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8-26364 Filed 11-14-08; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions. (1) Within 1,000 flight hours after the effective date of this AD, do visual inspections of both the aft engine mounting assemblies to find if the center bracket is correct (no sharp edges) from the manufacturer. (2) If no sharp edge is found during the inspection required by paragraph (f)(1) of this AD, before further flight, inspect to determine if the aft engine mounting assembly and center bracket are identified with a “-1,” and before further flight re-identify the parts that are not identified with a “-1,” in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. Following the re-identification, no further action is required by this AD for airplanes on which no sharp edge is found during the inspection required by paragraph (f)(1) of this AD. (3) If any sharp edge is found during the inspection required by paragraph (f)(1) of this AD, before further flight, do the action in paragraph (f)(3)(i) or (f)(3)(ii) of this AD in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. (i) Do a general visual inspection for cracking of the center bracket of both of the aft engine mounting assemblies, with the bracket on the wing, and repeat the inspection thereafter at intervals not to exceed 250 flight hours until the action required by paragraph (f)(4) of this AD is accomplished. (ii) Do general visual and penetrant inspections for cracking of the center bracket of both of the aft engine mounting assemblies, with the bracket off the wing. Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.” (4) At the applicable time in paragraph (f)(4)(i) or (f)(4)(ii) of this AD, do the applicable actions in those paragraphs in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000-71-025, dated June 13, 2007. Doing the applicable action terminates the repetitive inspection requirements of paragraph (f)(3)(i) of this AD. (i) If no cracking is found during any inspection required by paragraph (f)(3) of this AD: Within 4,000 flight hours after the effective date of this AD, rework the center bracket, and re-identify the aft engine mounting assembly and center bracket. (ii) If any cracking is found during any inspection required by paragraph (f)(3) of this AD, before further flight, replace the aft engine mounting assembly with an assembly and bracket identified with a “-1” part number. (5) Actions done before the effective date of this AD in accordance with Saab Service Bulletin 2000-71-023, Revision 01, dated June 13, 2007, are acceptable for compliance with the corresponding requirements of paragraph (f)(3) of this AD. FAA AD Differences Note 2: This AD differs from the MCAI and/or service information as follows: Although the MCAI or service information allows further flight after cracks are found during compliance with the required action, paragraph (f)(4) of this AD requires that you replace a cracked aft engine mounting assembly before further flight. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Shahram Daneshmandi, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1112; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2008-0068, dated April 11, 2008; and Saab Service Bulletin 2000-71-025, dated June 13, 2007; for related information. Material Incorporated by Reference (i) You must use Saab Service Bulletin 2000-71-025, dated June 13, 2007, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Saab Aircraft AB, SAAB Aircraft Product Support, S-581.88, Linköping, Sweden; telephone 011 46 13 18 5591; fax 011 46 13 18 4874; e-mail http://www.saab2000.techsupport@saabgroup.com ; Internet http://www.saabgroup.com . (3) You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Issued in Renton, Washington, on October 24, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8-26364 Filed 11-14-08; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1