Airworthiness directives › 2009-18-17
AD 2009-18-17 Airworthiness Directives; Agusta S.p.A. Model AB412 and AB412 EP Helicopters
Models named: AB412, AB412 EP. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to Model AB412 and AB412 EP helicopters, with internal hoist, part number (P/N) 214-070-300-1 (Goodrich P/N 42277-1); external hoist P/N BL-10300-60 (Breeze Eastern) or P/N BL-20200-SERIES (Breeze Eastern), installed, certificated in any category. Reason (d) The actions are intended to prevent failure of a hoist cable and inadvertent loss of a load.
Compliance
Required as indicated, do the following: (1) Before further flight, for rescue hoist cable assemblies, P/N 42305-179, 42277-178 (internal hoist cable assembly) and P/N BL-6260, BL-9149-3 (external hoist cable assembly), determine the number of accumulated “hoist cycles” for each hoist cable assembly and add that to the number of accumulated “hoist lifts.” A hoist lift is defined as an unreeling and recovery of the cable with a load attached to the hook, regardless of the length of the cable that is deployed or recovered. An unreeling or recovery of the cable with no load on the hook is not considered to be a lift. (2) Before conducting the next hoist operation, replace any hoist cable assembly that has reached or exceeded 1,500 accumulated hoist lifts or 4 years from initial installation, whichever occurs first. (3) If you cannot determine the “hoist cycles” or the date of the hoist cable assembly installation, before further flight, replace the hoist cable assembly with an airworthy hoist cable assembly. (4) This AD revises the Airworthiness limitations section of the maintenance manual by adding a life limit of 1,500 hoist lifts or 4 years, whichever occurs first, for the affected hoist cable assemblies. Differences Between This AD and the MCAI AD (f) We use the term “before further flight” rather than “before next flight. Also, we are using “before further flight” rather than October 31, 2008, for replacing a hoist cable if you cannot determine the “hoist cycles” or the date of hoist cable assembly installation. Other Information (g) Alternative Methods of Compliance (AMOCs): The Manager, Safety Management Group, FAA, ATTN: Sharon Miles, Aerospace Engineer, Regulations and Policy Group, 2601 Meacham Blvd., Rotorcraft Directorate, Fort Worth, Texas 76137, telephone (817) 222-5122, fax (817) 222-5961 has the authority to approve AMOCs for this AD, if requested, using the procedures found in 14 CFR 39.19. Related Information (h) The European Aviation Safety Agency (EASA) MCAI Airworthiness Directive No. 2008-0142-E, dated July 30, 2008, and Agusta Alert Bollettino Tecnico No. 412-126, dated July 28, 2008, contain related information. Joint Aircraft System/Component (JASC) Code (i) JASC Code 1400: Miscellaneous Hardware. Issued in Fort Worth, Texas, on August 26, 2009. Mark R. Schilling, Acting Manager, Rotorcraft Directorate, Aircraft Certification Service. [FR Doc. E9-21116 Filed 9-3-09; 8:45 am] BILLING CODE 4910-13-P
Required actions
Required as indicated, do the following: (1) Before further flight, for rescue hoist cable assemblies, P/N 42305-179, 42277-178 (internal hoist cable assembly) and P/N BL-6260, BL-9149-3 (external hoist cable assembly), determine the number of accumulated “hoist cycles” for each hoist cable assembly and add that to the number of accumulated “hoist lifts.” A hoist lift is defined as an unreeling and recovery of the cable with a load attached to the hook, regardless of the length of the cable that is deployed or recovered. An unreeling or recovery of the cable with no load on the hook is not considered to be a lift. (2) Before conducting the next hoist operation, replace any hoist cable assembly that has reached or exceeded 1,500 accumulated hoist lifts or 4 years from initial installation, whichever occurs first. (3) If you cannot determine the “hoist cycles” or the date of the hoist cable assembly installation, before further flight, replace the hoist cable assembly with an airworthy hoist cable assembly. (4) This AD revises the Airworthiness limitations section of the maintenance manual by adding a life limit of 1,500 hoist lifts or 4 years, whichever occurs first, for the affected hoist cable assemblies. Differences Between This AD and the MCAI AD (f) We use the term “before further flight” rather than “before next flight. Also, we are using “before further flight” rather than October 31, 2008, for replacing a hoist cable if you cannot determine the “hoist cycles” or the date of hoist cable assembly installation. Other Information (g) Alternative Methods of Compliance (AMOCs): The Manager, Safety Management Group, FAA, ATTN: Sharon Miles, Aerospace Engineer, Regulations and Policy Group, 2601 Meacham Blvd., Rotorcraft Directorate, Fort Worth, Texas 76137, telephone (817) 222-5122, fax (817) 222-5961 has the authority to approve AMOCs for this AD, if requested, using the procedures found in 14 CFR 39.19. Related Information (h) The European Aviation Safety Agency (EASA) MCAI Airworthiness Directive No. 2008-0142-E, dated July 30, 2008, and Agusta Alert Bollettino Tecnico No. 412-126, dated July 28, 2008, contain related information. Joint Aircraft System/Component (JASC) Code (i) JASC Code 1400: Miscellaneous Hardware. Issued in Fort Worth, Texas, on August 26, 2009. Mark R. Schilling, Acting Manager, Rotorcraft Directorate, Aircraft Certification Service. [FR Doc. E9-21116 Filed 9-3-09; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1