Airworthiness directives › 2010-02-10
AD 2010-02-10 Airworthiness Directives; Airbus Model A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, and -343 Series Airplanes; Model A340-211, -212, -213, -311, -312, and -313 Series Airplanes; and Model A340-541 and -642 Airplanes
Models named: A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to Airbus Model A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, and -343 series airplanes; Model A340-211, -212, -213, -311, -312, -313 series airplanes; and Model A340-541 and -642 airplanes; all serial numbers; certificated in any category.
Compliance
Unless already done, do the following actions. (1) At the applicable compliance time specified in paragraph (f)(1)(i), (f)(1)(ii), (f)(1)(iii), (f)(1)(iv), (f)(1)(v), or (f)(1)(vi) of this AD, perform one-time detailed inspections of both main landing gear bogie beams in the region of the bogie stop pad for detection of deformation and damage, and apply the applicable corrective actions, in accordance with instructions defined in the Airbus mandatory service bulletins listed in Table 1 of this AD, as applicable. Do all applicable corrective actions before further flight. (i) Airplanes with 22 months or less and 2,500 flight cycles or less from the first flight with the original bogie beam as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months on the original bogie beam, whichever occurs first, but not later than 40 months from first flight. (ii) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of a new bogie beam in service as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months from the installation date of the new bogie beam, whichever occurs first, but no later than 40 months from the installation date of a new bogie beam in service. (iii) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of an overhauled bogie beam in service as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months from the installation date of the overhauled bogie beam in service, whichever occurs first, but no later than 40 months from the installation date of the overhauled bogie beam in service. (iv) Airplanes with more than 22 months or more than 2,500 flight cycles from the first flight with the original bogie beam, as of the effective date of this AD: Within 18 months after the effective date of this AD. (v) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of a new bogie beam in service, as of the effective date of this AD: Within 18 months after the effective date of this AD. (vi) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of an overhauled bogie beam in service, as of the effective date of this AD: Within 18 months after the effective date of this AD. Table 1—Service Bulletins For model— Use Airbus Mandatory Service Bulletin— Dated— A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, -343 series airplanes A330-32-3220 October 10, 2008. A340-211, -212, -213, -311, -312, -313 series airplanes A340-32-4264 October 10, 2008. A340-541, -642 airplanes A340-32-5087 October 10, 2008. (2) Report the results of the inspection required by paragraph (f)(1) of this AD, including no findings, to Airbus, Customer Services Directorate, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex France; Attn: SEDCC1 Technical Data and Documentation Services; Fax (+33) 5 61 93 28 06; e-mail sb.reporting@airbus.com ; at the applicable time specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD. (i) If the inspection is done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was accomplished prior to the effective date of this AD: Submit the report within 30 days after the effective date of this AD. FAA AD Differences Note 1: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Vladimir Ulyanov, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1138; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency (EASA) Airworthiness Directive 2008-0223, dated December 15, 2008, and the Airbus mandatory service bulletins listed in Table 1 of this AD, for related information. Material Incorporated by Reference (i) You must use the service information contained in Table 2 of this AD, as applicable, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Airbus SAS—Airworthiness Office—EAL, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France; fax +33 5 61 93 45 80; e-mail airworthiness.A330-A340@airbus.com ; Internet http://www.airbus.com . (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Table 2—Material Incorporated by Reference Airbus Mandatory Service Bulletin— Dated— A330-32-3220 October 10, 2008. A340-32-4264 October 10, 2008. A340-32-5087 October 10, 2008. Issued in Renton, Washington, on January 14, 2010. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-1277 Filed 1-27-10; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions. (1) At the applicable compliance time specified in paragraph (f)(1)(i), (f)(1)(ii), (f)(1)(iii), (f)(1)(iv), (f)(1)(v), or (f)(1)(vi) of this AD, perform one-time detailed inspections of both main landing gear bogie beams in the region of the bogie stop pad for detection of deformation and damage, and apply the applicable corrective actions, in accordance with instructions defined in the Airbus mandatory service bulletins listed in Table 1 of this AD, as applicable. Do all applicable corrective actions before further flight. (i) Airplanes with 22 months or less and 2,500 flight cycles or less from the first flight with the original bogie beam as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months on the original bogie beam, whichever occurs first, but not later than 40 months from first flight. (ii) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of a new bogie beam in service as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months from the installation date of the new bogie beam, whichever occurs first, but no later than 40 months from the installation date of a new bogie beam in service. (iii) Airplanes with 22 months or less and 2,500 flight cycles or less from the installation date of an overhauled bogie beam in service as of the effective date of this AD: Not earlier than 2,500 flight cycles or 22 months from the installation date of the overhauled bogie beam in service, whichever occurs first, but no later than 40 months from the installation date of the overhauled bogie beam in service. (iv) Airplanes with more than 22 months or more than 2,500 flight cycles from the first flight with the original bogie beam, as of the effective date of this AD: Within 18 months after the effective date of this AD. (v) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of a new bogie beam in service, as of the effective date of this AD: Within 18 months after the effective date of this AD. (vi) Airplanes with more than 22 months or more than 2,500 flight cycles from the installation date of an overhauled bogie beam in service, as of the effective date of this AD: Within 18 months after the effective date of this AD. Table 1—Service Bulletins For model— Use Airbus Mandatory Service Bulletin— Dated— A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, -343 series airplanes A330-32-3220 October 10, 2008. A340-211, -212, -213, -311, -312, -313 series airplanes A340-32-4264 October 10, 2008. A340-541, -642 airplanes A340-32-5087 October 10, 2008. (2) Report the results of the inspection required by paragraph (f)(1) of this AD, including no findings, to Airbus, Customer Services Directorate, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex France; Attn: SEDCC1 Technical Data and Documentation Services; Fax (+33) 5 61 93 28 06; e-mail sb.reporting@airbus.com ; at the applicable time specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD. (i) If the inspection is done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was accomplished prior to the effective date of this AD: Submit the report within 30 days after the effective date of this AD. FAA AD Differences Note 1: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Vladimir Ulyanov, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1138; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency (EASA) Airworthiness Directive 2008-0223, dated December 15, 2008, and the Airbus mandatory service bulletins listed in Table 1 of this AD, for related information. Material Incorporated by Reference (i) You must use the service information contained in Table 2 of this AD, as applicable, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Airbus SAS—Airworthiness Office—EAL, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France; fax +33 5 61 93 45 80; e-mail airworthiness.A330-A340@airbus.com ; Internet http://www.airbus.com . (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Table 2—Material Incorporated by Reference Airbus Mandatory Service Bulletin— Dated— A330-32-3220 October 10, 2008. A340-32-4264 October 10, 2008. A340-32-5087 October 10, 2008. Issued in Renton, Washington, on January 14, 2010. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-1277 Filed 1-27-10; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1