Airworthiness directives › 2010-10-13
AD 2010-10-13 Airworthiness Directives; BAE Systems (Operations) Limited Model BAe 146 and Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A Airplanes
Models named: BAe 146-100A, -200A, -300A series, Avro 146-RJ70A, 146-RJ85A, 146-RJ100A. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to BAE Systems (Operations) Limited Model BAe 146-100A, -200A, and -300A series airplanes; and Model Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A airplanes; certificated in any category, all serial numbers.
Compliance
Unless already done, do the following actions. (1) At the applicable time identified in paragraph (f)(1)(i), (f)(1)(ii), or (f)(1)(iii) of this AD: Perform a detailed visual inspection and visual inspection (Method 1) or a detailed visual inspection (Method 2) for cracking and corrosion of the wing fixed leading edge and front spar structure, in accordance with paragraph 2.C. or 2.D., as applicable, of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (i) For airplanes with less than 9 years since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 18 months after the effective date of this AD. (ii) For airplanes with 9 years or more, but less than 15 years, since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 18 months after the effective date of this AD or within 16 years since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness, whichever occurs first. (iii) For airplanes with 15 years or more since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 6 months after the effective date of this AD. Note 1: Where BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, refers to a “visual inspection,” this term describes an inspection using visual inspection equipment as defined in Appendix 3 of that service bulletin. In other BAE Systems instructions for continued airworthiness, including the Maintenance Planning Document (MPD) and the Corrosion Prevention and Control Programme (CPCP), such an inspection is referred to as a “Special Detailed Inspection” (SDI). Note 2: At the discretion of the airplane owner/operator, corrosion protection may be embodied on those areas subject to a detailed visual inspection, in accordance with paragraph 2.E. or paragraph 2.F. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Embodiment of enhanced corrosion protection in accordance with paragraph 2.E. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, allows the interval of the repetitive inspection (as required by paragraph (f)(2) of this AD) to be extended in the area(s) of application in accordance with paragraph (f)(2)(i) or (f)(2)(ii) of this AD, as applicable. (2) After doing the initial inspection required by paragraph (f)(1) of this AD, at the applicable intervals specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD, accomplish the repetitive inspections of the wing fixed leading edge and front spar structure for cracking and corrosion in the “area of inspection” specified in Table 1 of paragraph 1.D., “Compliance,” of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Do the inspections in accordance with paragraph 2.C. (Method 1) or paragraph 2.D. (Method 2) of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Where previously applied, enhanced corrosion protection may then be re-applied, as an option, in accordance with paragraph 2.E. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Perform the repetitive inspections at the times specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD, as applicable. (i) For airplanes having enhanced corrosion protection that was applied during the previous inspection: Inspect at intervals not to exceed 144 months. (ii) For airplanes not having enhanced corrosion protection that was applied during the previous inspection: Inspect at intervals not to exceed 72 months. (3) After doing the initial inspection required by paragraph (f)(1) of this AD, at intervals not to exceed 36,000 flight cycles, accomplish fatigue inspections in accordance with paragraph 2.C. (Method 1) or paragraph 2.D. (Method 2) of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (4) If any cracking or corrosion is found during any inspection required by this AD, before further flight, repair in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (5) No repair terminates the inspection requirements of this AD. (6) Actions done before the effective date of this AD in accordance with BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, dated February 22, 2008, are considered acceptable for compliance with the corresponding actions specified in this AD. (7) Submit a report of the findings (both positive and negative) of the inspection required by paragraph (f)(1) of this AD to Customer Liaison, Customer Support (Building 37), BAE Systems (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland; fax +44 (0) 1292 675432; e-mail raengliaison@baesystems.com, at the applicable time specified in paragraphs (f)(7)(i) and (f)(7)(ii) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane serial number, and the number of landings and flight hours on the airplane. (i) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD. Note 3: The inspections required by this AD prevail over the Maintenance Review Board Report (MRBR), MPD, CPCP, and Supplemental Structural Inspection Document (SSID) inspections defined in paragraph 1.C.(3) of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. FAA AD Differences Note 4: This AD differs from the MCAI and/or service information as follows: Where the EASA AD refers to “since entry into service,” this AD specifies the date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1175; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2009-0014, dated January 21, 2009; and BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008; for related information. Material Incorporated by Reference (i) You must use BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact BAE Systems Regional Aircraft, 13850 McLearen Road, Herndon, Virginia 20171; telephone 703-736-1080; e-mail raebusiness@baesystems.com; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm . (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Issued in Renton, Washington, on April 30, 2010. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-11182 Filed 5-14-10; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions. (1) At the applicable time identified in paragraph (f)(1)(i), (f)(1)(ii), or (f)(1)(iii) of this AD: Perform a detailed visual inspection and visual inspection (Method 1) or a detailed visual inspection (Method 2) for cracking and corrosion of the wing fixed leading edge and front spar structure, in accordance with paragraph 2.C. or 2.D., as applicable, of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (i) For airplanes with less than 9 years since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 18 months after the effective date of this AD. (ii) For airplanes with 9 years or more, but less than 15 years, since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 18 months after the effective date of this AD or within 16 years since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness, whichever occurs first. (iii) For airplanes with 15 years or more since date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness as of the effective date of this AD: Within 6 months after the effective date of this AD. Note 1: Where BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, refers to a “visual inspection,” this term describes an inspection using visual inspection equipment as defined in Appendix 3 of that service bulletin. In other BAE Systems instructions for continued airworthiness, including the Maintenance Planning Document (MPD) and the Corrosion Prevention and Control Programme (CPCP), such an inspection is referred to as a “Special Detailed Inspection” (SDI). Note 2: At the discretion of the airplane owner/operator, corrosion protection may be embodied on those areas subject to a detailed visual inspection, in accordance with paragraph 2.E. or paragraph 2.F. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Embodiment of enhanced corrosion protection in accordance with paragraph 2.E. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, allows the interval of the repetitive inspection (as required by paragraph (f)(2) of this AD) to be extended in the area(s) of application in accordance with paragraph (f)(2)(i) or (f)(2)(ii) of this AD, as applicable. (2) After doing the initial inspection required by paragraph (f)(1) of this AD, at the applicable intervals specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD, accomplish the repetitive inspections of the wing fixed leading edge and front spar structure for cracking and corrosion in the “area of inspection” specified in Table 1 of paragraph 1.D., “Compliance,” of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Do the inspections in accordance with paragraph 2.C. (Method 1) or paragraph 2.D. (Method 2) of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Where previously applied, enhanced corrosion protection may then be re-applied, as an option, in accordance with paragraph 2.E. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. Perform the repetitive inspections at the times specified in paragraph (f)(2)(i) or (f)(2)(ii) of this AD, as applicable. (i) For airplanes having enhanced corrosion protection that was applied during the previous inspection: Inspect at intervals not to exceed 144 months. (ii) For airplanes not having enhanced corrosion protection that was applied during the previous inspection: Inspect at intervals not to exceed 72 months. (3) After doing the initial inspection required by paragraph (f)(1) of this AD, at intervals not to exceed 36,000 flight cycles, accomplish fatigue inspections in accordance with paragraph 2.C. (Method 1) or paragraph 2.D. (Method 2) of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (4) If any cracking or corrosion is found during any inspection required by this AD, before further flight, repair in accordance with the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. (5) No repair terminates the inspection requirements of this AD. (6) Actions done before the effective date of this AD in accordance with BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, dated February 22, 2008, are considered acceptable for compliance with the corresponding actions specified in this AD. (7) Submit a report of the findings (both positive and negative) of the inspection required by paragraph (f)(1) of this AD to Customer Liaison, Customer Support (Building 37), BAE Systems (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland; fax +44 (0) 1292 675432; e-mail raengliaison@baesystems.com, at the applicable time specified in paragraphs (f)(7)(i) and (f)(7)(ii) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane serial number, and the number of landings and flight hours on the airplane. (i) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD. Note 3: The inspections required by this AD prevail over the Maintenance Review Board Report (MRBR), MPD, CPCP, and Supplemental Structural Inspection Document (SSID) inspections defined in paragraph 1.C.(3) of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008. FAA AD Differences Note 4: This AD differs from the MCAI and/or service information as follows: Where the EASA AD refers to “since entry into service,” this AD specifies the date of issuance of the original airworthiness certificate or the date of issuance of the original export certificate of airworthiness. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1175; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency Airworthiness Directive 2009-0014, dated January 21, 2009; and BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008; for related information. Material Incorporated by Reference (i) You must use BAE Systems (Operations) Limited Inspection Service Bulletin ISB.57-072, Revision 1, dated September 25, 2008, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact BAE Systems Regional Aircraft, 13850 McLearen Road, Herndon, Virginia 20171; telephone 703-736-1080; e-mail raebusiness@baesystems.com; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm . (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . Issued in Renton, Washington, on April 30, 2010. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-11182 Filed 5-14-10; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1