Airworthiness directives › 2010-16-10
AD 2010-16-10 Airworthiness Directives; BAE Systems (Operations) Limited Model Avro 146-RJ and BAe 146 Airplanes
Models named: BAe 146-100A, -200A, -300A. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to BAE Systems (Operations) Limited Model BAe 146-100A, -200A, and -300A airplanes, and Avro 146-RJ70A, 146-RJ85A, and 146-RJ100A airplanes; all serial numbers; certificated in any category; as identified in paragraph 1.A.(1) of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007.
Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. Actions (g) Do the following actions. (1) For airplanes subject to maintenance review board report (MRBR) requirements: Within 30 days after the effective date of this AD, revise the supplemental structural inspection (SSI) portion of the airplane inspection schedule, in accordance with paragraph 1.D.(2) of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007. Do the initial inspection at the applicable time, and repeat at the applicable intervals, as specified in Appendix 3 of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007. Where Appendix 3 of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, does not specify a compliance time in either flight cycles or in flight hours, use flight cycles. (2) For airplanes subject to MRBR requirements: Accomplishing the inspections and all applicable corrective actions specified in paragraph 1.D.(3) of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, terminates the revisions to the SSI portion of the airplane inspection schedule incorporated in accordance with paragraph (g)(1) of this AD, provided that if any corrosion is found during any inspection specified in “Part C” or “Part D” of paragraph 2.C. of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, repair is accomplished before further flight using a method approved by the Manager, International Branch, ANM 116, Transport Airplane Directorate, FAA, or EASA (or its delegated agent). (3) For operational airplanes subject to MRBR-to-supplemental-structural-inspection-document (SSID) transition requirements or to SSID requirements: Within 5,000 flight cycles after the effective date of this AD, do the inspections and all applicable corrective actions, in accordance with paragraph 2.C. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, except if any corrosion is found during any inspection specified in “Part C” or “Part D” of paragraph 2.C. of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, repair must be accomplished using a method approved by the Manager, International Branch, ANM 116, Transport Airplane Directorate, FAA, or EASA (or its delegated agent). Do all applicable corrective actions before further flight, except that replacements of all the wing links that are not within the specified tolerance must be done before the airplane reaches its MRBR airframe life limit. Note 1: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.” (4) For any inspection done in accordance with paragraph (g)(2) or (g)(3) of this AD: Send reports to BAE Systems, Customer Liaison, Customer Support (Building 37), BAE Systems (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland; fax +44 (0) 1292 675432; e-mail raengliason@baesystems.com; at the applicable time specified in paragraph (g)(4)(i) or (g)(4)(ii) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane serial number, and the number of landings and flight hours on the airplane. (i) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD. (5) For airplanes that are non-operational as of the effective date of this AD and that are subject to MRBR-to-SSID transition requirements or to SSID requirements: Before returning any airplane to service, do the inspections and all applicable corrective actions, in accordance with paragraph 2.C. of the Accomplishment Instructions of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, except if any corrosion is found during any inspection specified in “Part C” or “Part D” of paragraph 2.C. of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, repair must be accomplished using a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, or EASA (or its delegated agent). (6) Actions accomplished before the effective date of this AD in accordance with BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, dated December 21, 2006, are considered acceptable for compliance with the corresponding action specified in this AD. FAA AD Differences Note 2: This AD differs from the MCAI and/or service information as follows: The MCAI does not specify a corrective action if corrosion is found during accomplishment of the actions specified in “Part C” and “Part D” of paragraph 2.C. of BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007. This AD requires that if any corrosion is found, a repair must be done in accordance with a method approved by the FAA or EASA (or its delegated agent). Other FAA AD Provisions (h) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1175; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (i) Refer to MCAI EASA Airworthiness Directive 2008-0003, dated January 8, 2008; and BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007; for related information. Material Incorporated by Reference (j) You must use BAE Systems (Operations) Limited Inspection Service Bulletin ISB.53-175, Revision 1, dated April 2, 2007, as applicable, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact BAE Systems (Operations) Limited, Customer Information Department, Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United Kingdom; telephone +44 1292 675207; fax +44 1292 675704; e-mail RApublications@baesystems.com; Internet http://www.baesystems.com/Businesses/RegionalAircraft/index.htm . (3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington, on July 28, 2010. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-19340 Filed 8-12-10; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1