AD 2010-21-09 Airworthiness Directives; PIAGGIO AERO INDUSTRIES S.p.A Model PIAGGIO P-180 Airplanes
Models named: PIAGGIO P-180. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to PIAGGIO AERO INDUSTRIES S.p.A. Model PIAGGIO P-180 airplanes, all serial numbers, that are: (i) Equipped with hose assembly, part number (P/N) 80-337276-001; and (ii) Certificated in any category.
Compliance
Unless already done, do the following actions: (1) Within the next 150 hours time-in-service (TIS) after the November 18, 2010 (the effective date of this AD) and repetitively thereafter at intervals not to exceed 165 hours TIS after the last inspection, inspect the left-hand (LH) and the right-hand (RH) engine mounted fuel heater for wear damage and minimum clearance. Do the inspections following Part A of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. (2) If any wear damage to either the LH or the RH fuel heater or to the oil cooling system hose is detected during any inspection required in paragraph (f)(1) of this AD, before further flight after the inspection, replace both hose assembly P/Ns 80-337276-001 with a new hose assembly P/N 80-337284-001. Do the replacements following Part B of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. Installing both the LH and the RH hose assembly P/N 80-337284-001 terminates the repetitive inspections required in paragraph (f)(1) of this AD. (3) If no wear damage to the fuel heater or to the oil cooling system hose is detected, but insufficient clearance is found during any inspection required in paragraph (f)(1) of this AD, within the next 660 hours TIS after the inspection, replace the LH and RH hose assembly P/N 80-337276-001 with a new hose assembly P/N 80-337284-001. Do the replacements following Part B of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. Installing both the LH and the RH hose assembly P/N 80-337284-001 terminates the repetitive inspections required in paragraph (f)(1) of this AD. (4) You may terminate the repetitive inspections required in paragraph (f)(1) of this AD by replacing both the LH and the RH hose assembly P/Ns 80-337276-001 with a new hose assembly P/N 80-337284-001 at any time after the initial inspection required in paragraph (f)(1) of this AD, as long as no wear damage to the fuel heater or to the oil cooling system hose is detected and sufficient clearance is found. FAA AD Differences Note: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, Standards Office, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: S.M. Nagarajan, Aerospace Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency (EASA) AD No.: 2010-0125, dated June 23, 2010; and PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010, for related information. Material Incorporated by Reference (i) You must use PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Piaggio Aero Industries S.p.a., Via Cibrario, 4-16154 Genoa, Italy; phone: +39 010 6481 353; fax: +39 010 6481 881; e-mail: airworthiness@piaggioaero.it; Internet: http://www.piaggioaero.com. (3) You may review copies of the service information incorporated by reference for this AD at the FAA, Central Region, Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 64106. For information on the availability of this material at the Central Region, call (816) 329-3768. (4) You may also review copies of the service information incorporated by reference for this AD at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Kansas City, Missouri, on September 29, 2010. John Colomy, Acting Manager, Small Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-25215 Filed 10-13-10; 8:45 am] BILLING CODE 4910-13-P
Required actions
Unless already done, do the following actions: (1) Within the next 150 hours time-in-service (TIS) after the November 18, 2010 (the effective date of this AD) and repetitively thereafter at intervals not to exceed 165 hours TIS after the last inspection, inspect the left-hand (LH) and the right-hand (RH) engine mounted fuel heater for wear damage and minimum clearance. Do the inspections following Part A of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. (2) If any wear damage to either the LH or the RH fuel heater or to the oil cooling system hose is detected during any inspection required in paragraph (f)(1) of this AD, before further flight after the inspection, replace both hose assembly P/Ns 80-337276-001 with a new hose assembly P/N 80-337284-001. Do the replacements following Part B of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. Installing both the LH and the RH hose assembly P/N 80-337284-001 terminates the repetitive inspections required in paragraph (f)(1) of this AD. (3) If no wear damage to the fuel heater or to the oil cooling system hose is detected, but insufficient clearance is found during any inspection required in paragraph (f)(1) of this AD, within the next 660 hours TIS after the inspection, replace the LH and RH hose assembly P/N 80-337276-001 with a new hose assembly P/N 80-337284-001. Do the replacements following Part B of the Accomplishment Instructions in PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010. Installing both the LH and the RH hose assembly P/N 80-337284-001 terminates the repetitive inspections required in paragraph (f)(1) of this AD. (4) You may terminate the repetitive inspections required in paragraph (f)(1) of this AD by replacing both the LH and the RH hose assembly P/Ns 80-337276-001 with a new hose assembly P/N 80-337284-001 at any time after the initial inspection required in paragraph (f)(1) of this AD, as long as no wear damage to the fuel heater or to the oil cooling system hose is detected and sufficient clearance is found. FAA AD Differences Note: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, Standards Office, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: S.M. Nagarajan, Aerospace Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329-4145; fax: (816) 329-4090. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056. Related Information (h) Refer to MCAI European Aviation Safety Agency (EASA) AD No.: 2010-0125, dated June 23, 2010; and PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010, for related information. Material Incorporated by Reference (i) You must use PIAGGIO AERO INDUSTRIES S.p.A. Service Bulletin (Mandatory) N.: 80-0175, Rev. N. 1, dated May 14, 2010, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Piaggio Aero Industries S.p.a., Via Cibrario, 4-16154 Genoa, Italy; phone: +39 010 6481 353; fax: +39 010 6481 881; e-mail: airworthiness@piaggioaero.it; Internet: http://www.piaggioaero.com. (3) You may review copies of the service information incorporated by reference for this AD at the FAA, Central Region, Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 64106. For information on the availability of this material at the Central Region, call (816) 329-3768. (4) You may also review copies of the service information incorporated by reference for this AD at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Kansas City, Missouri, on September 29, 2010. John Colomy, Acting Manager, Small Airplane Directorate, Aircraft Certification Service. [FR Doc. 2010-25215 Filed 10-13-10; 8:45 am] BILLING CODE 4910-13-P
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1