Airworthiness directives › 2011-18-10
AD 2011-18-10 Airworthiness Directives; The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER Series Airplanes
Models named: 737-600, -700, -700C, -800, -900, -900ER series. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to all The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes, certificated in any category.
Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. Restatement of Requirements of AD 2003-03-01 (68 FR 4367, January 29, 2003): Review of Maintenance Records (g) For Model 737-600, -700, -700C, -800, and -900 series airplanes: Within 90 days after February 13, 2003 (the effective date of AD 2003-03-01 (68 FR 4367, January 29, 2003)), review the airplane maintenance records to determine whether either engine has been removed since the airplane's date of manufacture. If neither engine has been removed since the airplane's date of manufacture, no further action is required by this paragraph. Inspection of Engines That Have Been Removed To Determine If Center Link Assembly Is Installed Correctly (h) For Model 737-600, -700, -700C, -800, and -900 series airplanes on which any installed engine has been removed from the airplane since the airplane's date of manufacture: Within 90 days after February 13, 2003, do a one-time general visual inspection to determine if the center link assembly of the aft engine mount is installed correctly, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 1, dated November 7, 2002; or Revision 3, dated May 20, 2004. If the center link assembly is installed correctly, no further action is required by paragraph (h) or (i) of this AD for that engine. As of the effective date of this AD, use only Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004. Note 1: For the purposes of this AD, a general visual inspection is: “A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hanger lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.” Follow-On and Corrective Actions (i) For airplanes on which any center link assembly is found installed incorrectly during any inspection required by paragraph (h), (k), or (l) of this AD: Before further flight, do the actions specified in paragraphs (i)(1), (i)(2), and (i)(3) of this AD, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 1, dated November 7, 2002; or Revision 3, dated May 20, 2004; except that it is not necessary to submit a report of findings to the airplane manufacturer. As of the effective date of this AD, use only Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004. (1) Remove the center link assembly and install it correctly. (2) Perform a detailed inspection of the engine mounting lugs and engine turbine rear frame for cracking, yielding, buckling, or wear damage. (3) Perform a detailed inspection of the hardware for the aft engine mount; including the center link assembly, right link assembly, aft mount hanger assembly, and link pins; for cracking, yielding, buckling, or wear damage. Note 2: For the purposes of this AD, a detailed inspection is: “An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required.” Repair (j) If any cracking, yielding, buckling, or wear damage is found during the inspections required by paragraphs (i)(2) and (i)(3) of this AD: Before further flight, replace the discrepant part with a new or serviceable part, or repair in accordance with a method approved in accordance with the procedures specified in paragraph (o) of this AD. New Requirements of This AD Inspection of Engines That Have Not Been Removed To Determine If Center Link Assembly Is Installed Correctly (k) For airplanes identified in Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004, on which any installed engine has not been removed from the airplane since the airplane's date of manufacture: Within 90 days after the effective date of this AD, do a detailed inspection to determine if the center link assembly of the aft engine mount is installed correctly, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004. If the center link is installed correctly, no further action is required by this paragraph for that engine. Follow-On and Corrective Actions (l) For airplanes on which any center link assembly is found installed incorrectly during the inspection required by paragraph (k) of this AD: Before further flight, do the follow-on and corrective actions required by paragraph (i) of this AD. Credit for Actions Done Using Previous Service Information (m) Inspections and corrective actions done before the effective date of this AD in accordance with a Boeing service bulletin listed in Table 1 of this AD are acceptable for compliance with the corresponding requirements of this AD. Table 1—Previous Service Bulletins Boeing Alert Service Bulletin— Revision— Dated— 737-71A1462 Original August 29, 2002. 737-71A1462 1 November 7, 2002. 737-71A1462 2 May 29, 2003. Parts Installation (n) As of the effective date of this AD, no person may install an engine on any airplane identified in paragraph (c) of this AD unless the actions required by paragraph (n)(1) or (n)(2) of this AD are accomplished. (1) The inspection is accomplished in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004, and the center link assembly of the aft engine mount is found to be installed correctly. (2) The hanger fitting and center link assembly are marked and part marked in accordance with Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004. Note 3: For hanger fittings and center link assemblies marked and part marked in production, as specified in Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004, the actions specified in paragraph (n)(2) of this AD do not apply. Alternative Methods of Compliance (AMOCs) (o) The certification office specified in paragraph (o)(1) or (o)(2) of this AD, as applicable, has the authority to approve AMOCs for paragraphs (i) and (j) of this AD, if requested using the procedures found in 14 CFR 39.19. (1) For the structure identified in paragraph (i)(2) of this AD: The Manager, Engine Certification Office (ECO), FAA. Send information to ATTN: Antonio Cancelliere, Aerospace Engineer, ANE-141, FAA, ECO, 12 New England Executive Park, Burlington, Massachusetts 01803-5299; telephone 781-238-7751; fax 781-238-7199. (2) For the structure identified in paragraph (i)(3) of this AD: The Manager, Seattle Aircraft Certification Office (ACO), FAA. Send information to ATTN: Alan Pohl, Aerospace Engineer, Airframe Branch, ANM-120S, FAA, Seattle ACO, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 917-6450; fax (425) 917-6590. Information may be e-mailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov. (3) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. The AMOC approval letter must specifically reference this AD. (4) An AMOC that provides an acceptable level of safety may be used for any repair required by paragraph (i)(3) of this AD if it is approved by Boeing Commercial Airplanes Organization Designation Authorization (ODA) that has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. Material Incorporated by Reference (p) You must use Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004, to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of Boeing Alert Service Bulletin 737-71A1462, Revision 3, dated May 20, 2004, under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206-544-5000, extension 1; fax 206-766-5680; e-mail me.boecom@boeing.com; Internet https://www.myboeingfleet.com. (3) You may review copies of the referenced service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221. (4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at an NARA facility, call 202-741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Issued in Renton, Washington on September 8, 2011. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. Peter A. White, Manager, Engine and Propeller Directorate, Engine and Propeller Directorate, Aircraft Certification Service. [FR Doc. 2011-24681 Filed 9-30-11; 8:45 am] BILLING CODE 4910-13-P
Unsafe condition
This AD was prompted by reports indicating that operators found that the center link assembly for the aft engine mount was reversed on several airplanes that had not had an engine removed since delivery. We are issuing this AD to prevent increased structural loads on the aft engine mount, which could result in failure of the aft engine mount and consequent separation of the engine from the airplane.
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1