TrackAD

Airworthiness directives › 2012-12-03

AD 2012-12-03 Airworthiness Directives; Rolls-Royce plc Turbofan Engines

2012-07-17
2012-07-02
—
—
Engine
—

Applicability*9

This AD applies to Rolls-Royce plc (RR) models RB211-Trent 970-84, 970B-84, 972-84, 972B-84, 977-84, 977B-84, and 980-84 turbofan engines.

Compliance

(1) On-Wing Borescope Inspections (i) Initially borescope-inspect the IP shaft rigid coupling splines. Use paragraphs 3.A.(2)(a) through 3.A.(2)(k) of RR RB211 Trent 900 Series Propulsion Systems Alert Non-Modification Service Bulletin (NMSB) No. RB.211-72-AG329, Revision 4, dated March 23, 2012, to do the inspection. Inspect per the following: (A) If the IP shaft rigid coupling has 250 or fewer flight cycles-since-new (FCSN) on the effective date of this AD, inspect before accumulating 400 FCSN; or (B) If the IP shaft rigid coupling has more than 250 FCSN on the effective date of this AD, inspect within 150 additional flight cycles. (ii) Repetitively borescope-inspect the IP shaft rigid coupling splines. Use paragraphs 3.A.(2)(a) through 3.A.(2)(l) of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG329, Revision 4, dated March 23, 2012, to determine the re-inspection interval and to do the inspections. (iii) If during the initial or any repetitive inspection, the average spline crest length measured dimension is less than 0.5 millimeters (mm), remove the engine from service before further flight. (2) In-Shop Inspections (i) At every shop visit after the effective date of this AD, where the IP shaft rigid coupling is exposed, visually inspect and magnetic particle inspect (MPI) the IP shaft rigid coupling splines. (ii) At every shop visit after the effective date of this AD, where the IP shaft rigid coupling is not exposed: (A) Inspect the IP shaft as specified in paragraph (f)(1) of this AD and determine the next inspection interval using Figure 10 of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG329, Revision 4, dated March 23, 2012; and (B) Reject any IP shaft with an average spline crest length measured dimension less than 1.0 mm. (3) After Any Shop Inspection After any shop inspection, where the IP shaft rigid coupling is exposed, perform a borescope inspection per paragraph (f)(1) of this AD within 400 cycles after the in-shop visual inspection and MPI. (4) Engine Installation (i) Before installing an engine in a new position on the same airplane, or before installing an engine on a different airplane in any position: (A) Inspect the IP shaft rigid coupling splines as specified in paragraphs (f)(1) or (f)(2) of this AD as applicable and determine the next inspection interval using Figure 10 of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG329, Revision 4, dated March 23, 2012; and (B) Do not install an engine that has an IP shaft with an average spline crest length measured dimension of less than 0.5 mm. (ii) Before installing an engine in the same position on the airplane it was removed from: (A) Inspect the IP shaft rigid coupling splines using paragraph (f)(1) or (f)(2) of this AD as applicable and determine the next inspection interval; and (B) Do not install an engine that has an IP shaft with an average spline crest length measured dimension of less than 0.5 mm.

Required actions

(1) On-Wing Borescope Inspections (i) Initially borescope-inspect the IP shaft rigid coupling splines before accumulating 400 FCSN or 400 cycles since the last inspection per paragraph (g)(2)(i) of this AD. Use paragraph 3.A.(2) of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG871, dated March 23, 2012, to do the inspection. (ii) Repetitively borescope-inspect the IP shaft rigid coupling splines. Use paragraphs 3.A.(2)(e), 3.A.(2)(f), and 3.A.(3) of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG871, dated March 23, 2012, to determine the re-inspection interval and to do the inspections. (2) In-Shop Inspections (i) At every shop visit after the effective date of this AD, where the IP shaft rigid coupling is exposed, visually inspect and MPI the IP shaft rigid coupling splines. (ii) At every shop visit after the effective date of this AD, where the IP shaft rigid coupling is not exposed, borescope-inspect using paragraphs 3.A.(2)(a) through 3.A.(2)(f) of RR RB211 Trent 900 Series Propulsion Systems Alert NMSB No. RB.211-72-AG871, dated March 23, 2012. (A) If at the time of initial inspection, the average value of length “B” is equal to, or less than, 6.00 mm, repeat the borescope inspection using paragraph (g)(1) or (g)(2) of this AD within 400 flight cycles. (B) If at the time of initial inspection the average value of length “B” is greater than 6.00 mm, MPI the IP turbine shaft, and visually inspect and MPI the intermediate turbine shaft and IP rigid coupling. (3) After Any Shop Inspection After any shop inspection, where the rigid shaft coupling is exposed, perform a borescope inspection per paragraph (g)(1) of this AD within 400 cycles after the in-shop visual inspection and MPI.

Unsafe condition

Comply with this AD within the compliance times specified, unless already done.

Affected ADs

This AD supersedes AD 2010-16-07, Amendment 39-16384 (75 FR 49368, August 13, 2010).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1