Airworthiness directives › 2013-03-22
AD 2013-03-22 Airworthiness Directives; Bombardier, Inc. Airplanes
Applicability*9
This AD applies to Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes, certificated in any category, serial numbers (S/Ns) 7003 and subsequent, configured with a Class C cargo compartment, including airplanes modified by Supplemental Type Certificate (STC) ST01292NY, amended July 7, 2003 ( http://www.airweb.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/1BB5140B1D3A130086256D7A006DF851?OpenDocument&Highlight=st01292ny ).
Compliance
You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Required actions
Within 28 months after the effective date of this AD, replace the cargo compartment liners, in accordance with the Accomplishment Instructions of the applicable service bulletin specified in paragraphs (g)(1) through (g)(3) of this AD, except as provided by paragraph (h) of this AD. For airplanes that do not have a configuration specified in paragraphs (g)(1) through (g)(3) of this AD: Prior to accomplishing the replacement, convert the cargo compartment liner to one of the configurations specified in paragraphs (g)(1) through (g)(3) of this AD, in accordance with a method approved by the Manager, New York Aircraft Certification Office (ACO), ANE-170, FAA; or Transport Canada Civil Aviation (TCCA) (or its delegated agent). To meet the requirements of this AD, the applicable Bombardier service bulletin or COMTEK service bulletin must be followed in its entirety, except as provided by paragraph (h) of this AD, with no mixing of Bombardier-supplied or COMTEK-supplied liners. (1) For airplanes with North American cargo compartment configuration: Bombardier Service Bulletin 601R-25-187, Revision A, dated September 1, 2011; or COMTEK Service Bulletin COMSB-25-52-001, Revision A, dated December 29, 2011. Note (1) to paragraph (g)(1) of this AD: COMTEK Service Bulletin COMSB-25-52-001, Revision A, dated December 29, 2011, installs STC ST01292NY amended July 7, 2003 ( http://www.airweb.faa.gov/Regulatory_and_Guidance_Library/rgstc.nsf/0/1BB5140B1D3A130086256D7A006DF851?OpenDocument&Highlight=st01292ny ), (which corresponds to TCCA STC SA01-19, Issue 2, dated December 21, 2011 ( http://www.regulations.gov/contentStreamer?objectId=0900006481216f85&disposition=attachment&contentType=pdf )) flammability-compliant cargo liner replacement panels. (2) For airplanes with European cargo compartment configuration: Bombardier Service Bulletin 601R-25-198, dated September 1, 2011. (3) For airplanes with Universal cargo compartment configuration: Bombardier Service Bulletin 601R-25-199, dated September 1, 2011.
Unsafe condition
This AD was prompted by reports that airplanes with a Class C cargo (baggage) compartment have liners that do not meet flammability requirements. We are issuing this AD to prevent inadequate fire protection in the cargo compartment and consequent uncontrolled fire.
Affected ADs
None.
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1