TrackAD

Airworthiness directives › 2013-03-23

AD 2013-03-23 Airworthiness Directives; Gulfstream Aerospace LP (Type Certificate Previously Held by Israel Aircraft Industries, Ltd.) Airplanes

Superseded. This directive was replaced by AD 2014-15-19. Work to the current one.
2013-03-26
2013-02-19
—
—
Airframe
2014-15-19

Models named: Gulfstream G150. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to Gulfstream Aerospace LP (Type Certificate previously held by Israel Aircraft Industries, Ltd.) Model Gulfstream G150 airplanes; certificated in any category; all serial numbers.

Compliance

You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.

Required actions

Within 60 days after the effective date of this AD, revise Section V, Performance, of the Gulfstream G150 AFM to include the information in Gulfstream G150 Temporary Revision (TR) 3, dated December 14, 2011. This TR introduces corrections for runway slope. Operate the airplane according to the procedures in this TR. Note 1 to paragraph (g) of this AD: The AFM revision required by paragraph (g) of this AD may be done by inserting copies of Gulfstream G150 TR 3, dated December 14, 2011, in the AFM. When this TR has been included in general revisions of the AFM, the general revisions may be inserted in the AFM, provided the relevant information in the general revision is identical to that in Gulfstream G150 TR 3, dated December 14, 2011, and the TR may be removed.

Unsafe condition

This AD was prompted by a review that determined that the runway slope and anti-ice corrections to V 1 and take-off distances in the G150 Airplane Flight Manual (AFM) were presented in a non-conservative manner. We are issuing this AD to prevent the use of published non-conservative data, which could result in the inability to meet the required take-off performance, with consequent hazard to safe operation during performance-limited take-off operations.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1