TrackAD

Airworthiness directives › 2013-22-19

AD 2013-22-19 Airworthiness Directives; Gulfstream Aerospace Corporation Airplanes

Superseded. This directive was replaced by AD 2017-08-01. Work to the current one.
2014-01-07
2013-12-03
39-17651
FAA-2012-1313
Airframe
2017-08-01

Models named: GV, GV-SP. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to all Gulfstream Aerospace Corporation Model GV and GV-SP airplanes, certificated in any category.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

Within 36 months after the effective date of this AD, inspect the fuel boost pumps to determine whether Gulfstream P/N 1159SCP500-5 is installed, in accordance with the Accomplishment Instructions of Gulfstream V Customer Bulletin 197, dated April 11, 2012, including the service information specified in paragraphs (g)(1) and (g)(2) of this AD (for Model GV airplanes); or Gulfstream G550 Customer Bulletin 122, dated April 11, 2012, including the service information specified in paragraphs (g)(1) and (g)(2) of this AD (for Model GV-SP airplanes). A review of airplane maintenance records is acceptable in lieu of this inspection if the part number of the fuel boost pumps can be conclusively determined from that review. (1) Triumph Aerostructures Service Bulletin SB-TAGV/GVSP-28-JG0162, dated August 30, 2011. (2) GE Service Bulletin 31760-28-100, dated February 15, 2011.

Unsafe condition

This AD was prompted by reports of two independent types of failure of the fuel boost pump with overheat damage found on the internal components and external housing on one of the failure types, and fuel leakage on the other. We are issuing this AD to prevent fuel leakage in combination with a capacitor clearance issue, which could result in an uncontrolled fire in the wheel well.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1