TrackAD

Airworthiness directives › 2014-23-07

AD 2014-23-07 Airworthiness Directives; Airbus Airplanes

2014-12-31
2014-11-26
—
—
Airframe
—

Models named: A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to Airbus Model A330-201, -202, -203, -223, -243, -301, -302, -303, -321, -322, -323, -341, -342, and -343 airplanes; and Model A340-211, -212, -213, -311, -312, and -313 airplanes; certificated in any category; all manufacturer serial numbers, except for those airplanes that have had Airbus Modification 52980 incorporated in production on both main landing gear (MLG) units, or airplanes that have had Airbus Modification 54500 incorporated in production.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

At the applicable time specified in paragraph (g)(1) or (g)(2) of this AD: Do a detailed inspection for cracking of the visible chromed area of the MLG retraction actuator piston rods in the fully extended position, in accordance with the Accomplishment Instructions of Airbus Service Bulletin A330-32-3173, Revision 05, dated September 26, 2008 (for Model A330-200 and -300 series airplanes); or Airbus Service Bulletin A340-32-4212, Revision 05, dated September 26, 2008 (for Model A340-200 and -300 series airplanes). Repeat the inspection thereafter at intervals not to exceed 8 days until the actions required by paragraphs (j) and (o) of this AD are accomplished. (1) For MLG retraction actuator piston rods that have not had a detailed inspection accomplished as of the effective date of this AD, as described in any applicable service information specified in paragraph (h)(1) or (h)(2) of this AD: At the applicable time specified in paragraph (g)(1)(i) or (g)(1)(ii) of this AD. (i) For MLG retraction actuator piston rods having part number (P/N) 114256309 or P/N 114256321 issue 03: Do the inspection within 60 days after the effective date of this AD, or before the MLG retraction actuator has been in service 36 months, whichever occurs later. (ii) For MLG retraction actuator piston rods having P/N 114256326 issue 01 or P/N 114256321 issue 06: Do the inspection within 60 days after the effective date of this AD, or before the MLG retraction actuator has been in service 72 months, whichever occurs later. (2) For MLG retraction actuator piston rods having P/N 114256309, P/N 114256321 issue 03, P/N 114256326 issue 01, or P/N 114256321 issue 06, that have had a detailed inspection accomplished as of the effective date of this AD, as described in the applicable service information specified in paragraph (h)(1) or (h)(2) of this AD: Inspect within 8 days after the effective date of this AD.

Unsafe condition

This AD was prompted by reports of the piston rods for the MLG retraction actuators rupturing during flight. We are issuing this AD to prevent cracking of the piston rods for the MLG retraction actuators, which could result in rupture of a piston rod, non-damped extension of the MLG, high loads on the fully extended MLG, and consequent reduced structural integrity of the MLG.

Affected ADs

This AD replaces AD 2004-16-01, Amendment 39-13757 (69 FR 46979, August 4, 2004).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1