TrackAD

Airworthiness directives › 2015-20-04

AD 2015-20-04 Airworthiness Directives; Pratt & Whitney Canada Corp. Turboshaft Engines

Superseded. This directive was replaced by AD 2019-22-03. Work to the current one.
2015-11-18
2015-10-14
39-18282
FAA-2015-0486
Engine
2019-22-03

Applicability*9

This AD applies to Pratt & Whitney Canada Corp. (P&WC) PT6B-37A turboshaft engines with engine serial numbers identified in Table 1 of paragraph 4, Appendix, in P&WC Service Bulletin (SB) No. PT6B-72-39095, Revision No. 3, dated December 29, 2014.

Compliance

You do not have to contact your Local Field Service Representative as discussed in paragraph 3.C.(3) of P&WC SB No. PT6B-72-39095, Revision No. 3, dated December 29, 2014.

Required actions

If you previously replaced the No. 9 and No. 10 bearings in accordance with the instructions contained in P&WC SB No. PT6B-72-39092, Revision No. 2, dated August 8, 2014, or earlier revisions, then you have complied with this AD.

Unsafe condition

Comply with this AD within the compliance times specified, unless already done. (1) Initial Inspection (i) Within 50 flight hours (FHs) time in service after the effective date of this AD, inspect the No. 10 bearing, part number (P/N) 3310433-03, in the RGB assembly for axial movement. Use paragraphs 3.A. to 3.C. in the Accomplishment Instructions in P&WC SB No. PT6B-72-39095, Revision No. 3, dated December 29, 2014, to do the inspection. If the bearing fails the inspection, replace the No. 9 and No. 10 bearings before further flight. (2) Repetitive Inspection (i) For engines with 500 FHs or less total time since new (TSN), repeat the inspection required by paragraph (e)(1) of this AD every 100 FHs time since last inspection (TSLI) until 500 hours total TSN, and, thereafter, every 200 FHs TSLI until removal. (ii) For engines with more than 500 FHs total TSN perform the inspection required by paragraph (e)(1) to this AD within 200 FHs TSLI, and, thereafter, every 200 FHs TSLI until removal. (3) Removal and Replacement of Affected Bearings (i) For engine serial numbers (S/Ns) PCE-PU0192, PU0193, PU0201, PU0208, PU0209, PU0212, PU0213, PU0214, PU0216, PU0219, and PU0220, remove the No. 9 and No. 10 bearings, P/N 3310433-03, within 450 FHs or 42 months after the effective date of this AD, whichever occurs first, and replace with parts eligible for installation. (ii) For all engine S/Ns identified in Applicability paragraph (c) of this AD, other than those listed in paragraph (e)(3)(i) of this AD, remove the No. 9 and No. 10 bearings, P/N 3310433-03, and replace with parts eligible for installation within 42 months after the effective date of this AD. (iii) Replacement of the No. 9 and No. 10 bearing, P/N 3310433-03, with the No. 9 and No. 10 bearing, P/N 3310233-03 or P/N 3310533-03, is terminating action for this AD.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1