TrackAD

Airworthiness directives › 2016-07-09

AD 2016-07-09 Airworthiness Directives; BAE SYSTEMS (Operations) Limited Airplanes

Superseded. This directive was replaced by AD 2023-02-06. Work to the current one.
2016-05-16
2016-04-11
—
—
Airframe
2023-02-06

Models named: 4101. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to all BAE SYSTEMS (Operations) Limited Model 4101 airplanes, certificated in any category.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

This paragraph restates the requirements of paragraph (i) of AD 2011-21-06, with no changes. Within 90 days after November 23, 2011 (the effective date of AD 2011-21-06): Revise the maintenance program by incorporating Subjects 05-10-10, “Airworthiness Limitations”; 05-10-20, “Certification Maintenance Requirements”; and 05-10-30, “Critical Design Configuration Control Limitations (CDCCL)—Fuel System”; of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited Jetstream Series 4100 Aircraft Maintenance Manual (AMM), Revision 35, dated February 15, 2011. The initial compliance times for the tasks are at the applicable times specified in paragraphs (g)(1), (g)(2), and (g)(3) of this AD. Doing the actions required by paragraph (i) of this AD terminates the requirements of this paragraph. (1) For replacement tasks of life limited parts specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited Jetstream Series 4100 AMM, Revision 35, dated February 15, 2011: Prior to the applicable flight cycles (landings) or flight hours (flying hours) on the part specified in the “Mandatory Life Limits” column in Subject 05-10-10, or within 90 days after November 23, 2011 (the effective date of AD 2011-21-06), whichever occurs later. (2) For structurally significant item tasks specified in Subject 05-10-10, “Airworthiness Limitations,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited Jetstream Series 4100 AMM, Revision 35, dated February 15, 2011: Prior to the accumulation of the applicable flight cycles specified in the “Initial Inspection” column in Subject 05-10-10, or within 90 days after November 23, 2011 (the effective date of AD 2011-21-06), whichever occurs later. (3) For certification maintenance requirements tasks specified in Subject 05-10-20, “Certification Maintenance Requirements,” of Chapter 05, “Airworthiness Limitations,” of the BAE Systems (Operations) Limited Jetstream Series 4100 AMM, Revision 35, dated February 15, 2011: Prior to the accumulation of the applicable flight hours specified in the “Time Between Checks” column in Subject 05-10-20, or within 90 days after November 23, 2011 (the effective date of AD 2011-21-06), whichever occurs later; except for tasks that specify “first flight of the day” in the “Time Between Checks” column in Subject 05-10-20, the initial compliance time is the first flight of the next day after doing the revision required by paragraph (g) of this AD, or within 90 days after November 23, 2011 (the effective date of AD 2011-21-06), whichever occurs later.

Unsafe condition

This AD was prompted by the need to reduce the life limit of certain main landing gear components, and to add certain post-repair inspections of critical structure to the maintenance or inspection program. We are issuing this AD to prevent failure of certain structurally significant items, including the main landing gear and nose landing gear, which could result in reduced structural integrity of the airplane; and to prevent fuel vapor ignition sources, which could result in a fuel tank explosion and consequent loss of the airplane.

Affected ADs

This AD replaces AD 2011-21-06, Amendment 39-16829 (76 FR 64788, October 19, 2011) (“AD 2011-21-06”).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1