TrackAD

Airworthiness directives › 2016-22-05

AD 2016-22-05 Airworthiness Directives; Pratt & Whitney Division Turbofan Engines

Superseded. This directive was replaced by AD 2019-06-07. Work to the current one.
2016-12-06
2016-11-01
39-18694
FAA-2016-5423
Engine
2019-06-07

Applicability*9

This AD applies to Pratt & Whitney (PW): (1) PW4164, PW4168, and PW4168A model engines that have incorporated PW Service Bulletin (SB) PW4G-100-72-214, dated December 15, 2011, or PW SB PW4G-100-72-219, Revision No. 1, dated October 5, 2011, or original issue, and have fuel nozzles, part number (P/N) 51J345, installed; (2) PW4168A model engines with Talon IIA outer combustion chamber assembly, P/N 51J100, and fuel nozzles, P/N 51J345, with serial numbers CGGUA19703 through CGGUA19718 inclusive or CGGUA22996 and higher, installed; (3) PW4168A-1D and PW4170 model engines with engine serial numbers P735001 thru P735190 inclusive and fuel nozzles, P/N 51J345, installed; and (4) PW4164-1D, PW4168-1D, PW4168A-1D, and PW4170 model engines that have incorporated PW SB PW4G-100-72-220, Revision No. 4, dated September 30, 2011, or earlier revision, and have fuel nozzles, P/N 51J345, installed.

Compliance

(1) For the purpose of this AD, an “engine shop visit” means the induction of an engine into the shop for any maintenance. (2) For the purpose of this AD, a part that is “eligible for installation” is a fuel nozzle, with a P/N other than 51J345, that is FAA-approved for installation or a fuel nozzle, P/N 51J345, that meets the requirements of Part A, paragraph 4.B., or Part B, paragraph 1.B. of PW ASB PW4G-100-A73-45, dated February 16, 2016.

Required actions

The Manager, Engine Certification Office, FAA, may approve AMOCs for this AD. Use the procedures found in 14 CFR 39.19 to make your request. You may email your request to: ANE-AD-AMOC@faa.gov.

Unsafe condition

Comply with this AD within the compliance times specified, unless already done. (1) Within 800 flight hours after the effective date of this AD, and thereafter within every 800 flight hours accumulated on the fuel nozzles, do the following: (i) Inspect all fuel nozzles, P/N 51J345. Use Part A of PW Alert Service Bulletin (ASB) PW4G-100-A73-45, dated February 16, 2016, to do the inspection. (ii) For any fuel nozzle that fails the inspection, before further flight, remove and replace it with a part that is eligible for installation. (2) At the next shop visit after the effective date of this AD, and thereafter at each engine shop visit, remove all fuel nozzles, P/N 51J345, unless fuel nozzles were replaced within the last 100 flight hours. Use Part B of PW ASB PW4G-100-A73-45, dated February 16, 2016, to replace the fuel nozzles with parts eligible for installation.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1