TrackAD

Airworthiness directives › 2016-23-07

AD 2016-23-07 Airworthiness Directives; Bombardier, Inc. Airplanes

2016-12-30
2016-11-25
—
—
Airframe
—

Applicability*9

This AD applies to Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes, certificated in any category, serial numbers 7003 through 8113 inclusive.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

(1) For airplanes on which the detailed inspection specified in Bombardier Service Bulletin 601R-27-160, dated September 29, 2011; or Bombardier Service Bulletin 601R-27-160, Revision A, dated October 3, 2012; has not been done as of the effective date of this AD: At the earliest of the times specified in paragraphs (g)(1)(i), (g)(1)(ii), and (g)(1)(iii) of this AD, measure the diameter of the bolts that attach the trunnions and pins; measure the diameter of the attach holes in the airplane structure, and, as applicable, measure the diameter of the attach holes in the trunnions and pins; do detailed visual inspections for gouges, scratches, and corrosion of the trunnions and pins; do detailed visual inspections for damage of the spacers; do corrective actions; and re-identify trunnions and pins; in accordance with Part A of the Accomplishment Instructions of Bombardier Service Bulletin 601R-27-160, Revision D, dated October 22, 2015; except as required by paragraph (h) of this AD. Do all applicable corrective actions before further flight. (i) Within 5,000 flight hours after March 11, 2013 (the effective date of AD 2013-02-08). (ii) Within 60 months after March 11, 2013 (the effective date of AD 2013-02-08). (iii) Before the accumulation of 40,000 total flight cycles, or within 60 days after March 11, 2013 (the effective date of AD 2013-02-08), whichever occurs later. (2) For airplanes on which the detailed inspection specified in Bombardier Service Bulletin 601R-27-160, dated September 29, 2011; or Bombardier Service Bulletin 601R-27-160, Revision A, dated October 3, 2012; has been done as of the effective date of this AD: Within 9,600 flight hours or 60 months after the effective date of this AD, whichever occurs first, measure the diameter of the bolts that attach the trunnions and pins; measure the diameter of the attach holes in the airplane structure, and, as applicable, measure the diameter of the attach holes in the trunnions and pins; do detailed visual inspections for gouges, scratches, and corrosion of the trunnions and pins; do detailed visual inspections for damage of the spacers; do corrective actions; and re-identify trunnions and pins; in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 601R-27-160, Revision D, dated October 22, 2015, except as required by paragraph (h) of this AD. Do all applicable corrective actions before further flight.

Unsafe condition

This AD was prompted by a determination that not all affected attachment pins and trunnions were included in the inspections required by AD 2013-02-08, and that incorrect attachment hardware may have been used in replacements on certain airplanes. We are issuing this AD to prevent failure of the attachment pins and trunnions of the horizontal stabilizer trim actuator (HSTA), which could result in separation of the horizontal stabilizer, and consequent loss of control of the airplane.

Affected ADs

This AD replaces AD 2013-02-08, Amendment 39-17329 (78 FR 7647, February 4, 2013) (“AD 2013-02-08”).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1