TrackAD

Airworthiness directives › 2018-19-21

AD 2018-19-21 Airworthiness Directives; The Boeing Company Airplanes

2018-11-01
2018-09-27
39-19422
FAA-2017-1026
Airframe
—

Models named: 707-100 long body, -200, -100B long body, -100B short body, -300, -300B, -300C, -400 series, 720, 720B series. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to all The Boeing Company airplanes, certificated in any category, identified in paragraphs (c)(1) and (c)(2) of this AD. (1) Model 707-100 long body, -200, -100B long body, -100B short body, -300, -300B, -300C, and -400 series airplanes. (2) Model 720 and 720B series airplanes.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

Within 60 days after the effective date of this AD, revise the maintenance or inspection program, as applicable, to incorporate the information in Section A, including Subsections A.1, A.2, and Appendix A, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016; except as provided in paragraph (h) of this AD. The initial compliance times for the AWL tasks are within the applicable compliance times specified in paragraphs (g)(1) through (g)(5) of this AD. (1) AWL No. 28-AWL-01, External Wires Over Center Fuel Tank, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016. The initial compliance time for accomplishment of the actions specified by AWL No. 28-AWL-01 is specified in paragraph (g)(1)(i) or (g)(1)(ii) of this AD, as applicable. (i) For airplanes that have been previously inspected as specified in 28-AWL-01 as of the effective date of this AD: Conduct the inspection within 120 months after the most recent inspection. (ii) For airplanes that have not been inspected as specified in 28-AWL-01 as of the effective date of this AD: Conduct the inspection within 12 months after the effective date of this AD. (2) AWL No. 28-AWL-18, AC Fuel Boost Pump Bonding Installation, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016. The initial compliance time for accomplishment of the actions specified by AWL No. 28-AWL-18 is specified in paragraph (g)(2)(i) or (g)(2)(ii) of this AD, as applicable. (i) For airplanes that have been previously inspected as specified in 28-AWL-18 as of the effective date of this AD: Conduct the inspection within 72 months after the most recent inspection. (ii) For airplanes that have not been inspected as specified in 28-AWL-18 as of the effective date of this AD: Conduct the inspection within 12 months after the effective date of this AD. (3) AWL No. 28-AWL-19, Fuel Valve Bonding Jumper Installation—Engine Fuel Shutoff, Defuel, Reserve Tank Transfer, Fuel Dump, and Fuel Manifold Valves, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016. The initial compliance time for accomplishment of the actions specified by AWL No. 28-AWL-19 is specified in paragraph (g)(3)(i) or (g)(3)(ii) of this AD, as applicable. (i) For airplanes that have been previously inspected as specified in 28-AWL-19 as of the effective date of this AD: Conduct the inspection within 72 months after the most recent inspection. (ii) For airplanes that have not been inspected as specified in 28-AWL-19 as of the effective date of this AD: Conduct the inspection within 12 months after the effective date of this AD. (4) AWL No. 28-AWL-21, Dry Bay Fuel Manifold Assembly—Bonding Jumper Installation, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016. The initial compliance time for accomplishment of the actions specified by AWL No. 28-AWL-21 is specified in paragraph (g)(4)(i) or (g)(4)(ii) of this AD, as applicable. (i) For airplanes that have been previously inspected as specified in 28-AWL-21 as of the effective date of this AD: Conduct the inspection within 72 months after the most recent inspection. (ii) For airplanes that have not been inspected as specified in 28-AWL-21 as of the effective date of this AD: Conduct the inspection within 12 months after the effective date of this AD. (5) AWL No. 28-AWL-23, Reserve Tank Transfer Piping Assembly—Bonding Jumper Installation, as specified in Boeing 707/720 Airworthiness Limitations (AWLs), D6-7552-AWL, dated October 2016. The initial compliance time for accomplishment of the actions specified by AWL No. 28-AWL-23 is specified in paragraph (g)(5)(i) or (g)(5)(ii) of this AD, as applicable. (i) For airplanes that have been previously inspected as specified in 28-AWL-23 as of the effective date of this AD: Conduct the inspection within 72 months after the most recent inspection. (ii) For airplanes that have not been inspected as specified in 28-AWL-23 as of the effective date of this AD: Conduct the inspection within 12 months after the effective date of this AD.

Unsafe condition

This AD was prompted by fuel system reviews conducted by the manufacturer. We are issuing this AD to detect and correct potential ignition sources inside fuel tanks caused by latent failures, alterations, repairs, or maintenance actions, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane.

Affected ADs

This AD affects the ADs specified in paragraphs (b)(1) and (b)(2) of this AD. (1) AD 2008-04-11 R1, Amendment 39-16147 (74 FR 68505, December 28, 2009) (“AD 2008-04-11 R1”). (2) AD 2013-24-07, Amendment 39-17681 (78 FR 72550, December 3, 2013) (“AD 2013-24-07”).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1