TrackAD

Airworthiness directives › 2020-11-13

AD 2020-11-13 July 14, 2020 Airworthiness Directives; De Havilland Aircraft of Canada Limited (Type Certificate Previously Held by Bombardier, Inc.) Airplanes

2020-07-14
2020-06-09
—
—
Airframe
—

Models named: DHC-8-400, -401, -402. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to De Havilland Aircraft of Canada Limited (Type Certificate previously held by Bombardier, Inc.) Model DHC-8-400, -401, and -402 airplanes, certificated in any category, serial numbers 4001 and subsequent.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

This paragraph restates the requirements of paragraph (g) of AD 2010-23-04, with revised service information and revised replacement instructions. For airplanes having serial numbers 4001 through 4304 inclusive, 4314, and 4315: Within 100 flight hours after November 22, 2010 (the effective date of AD 2010-23-04), do a detailed inspection for cracking, and a conductivity inspection on each of the 4 nacelle attachment fittings, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-54-14, Revision K, dated August 7, 2018. Repeat the detailed inspection at intervals not to exceed 300 flight hours, except as provided by paragraph (i) of this AD. Accomplishing the replacement specified in paragraph (g)(1)(ii) or (g)(2)(ii)(B) of this AD terminates the inspections required by this paragraph. (1) If any nacelle attachment fitting is found cracked, before further flight, do the action specified in paragraph (g)(1)(i) or (ii) of this AD. As of the effective date of this AD, only the action specified in paragraph (g)(1)(ii) of this AD may be done. (i) Replace the fitting with a new fitting in accordance with paragraph (2) of Part A of the Accomplishment Instructions of Bombardier Service Bulletin 84-54-14, Revision K, dated August 7, 2018. (ii) Replace the rear spar nacelle attachment fitting and associated structure with a new nacelle attachment fitting, part number (P/N) 8Z9305, and do all applicable related investigative and corrective actions, in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 84-54-16 Revision D, dated August 7, 2018. Do all applicable related investigative and corrective actions before further flight. (2) If the conductivity of any test points on any fitting is found to be greater than 45.0 percent International Annealed Copper Standard (IACS) or if the conductivity of any test points on any fitting is found to be less than 38.0 percent IACS, do the actions required by paragraphs (g)(2)(i) and (ii) of this AD. (i) Within 24 hours after accomplishing the conductivity inspection specified in paragraph (g) of this AD, do a detailed inspection of the nacelle attachment fitting for cracking, in accordance with the Accomplishment Instructions of Bombardier Service Bulletin 84-54-14, Revision K, dated August 7, 2018, and repeat thereafter at intervals not to exceed 24 hours. If cracking is found, before further flight, replace the fitting with a new fitting in accordance with the requirements of paragraph (g)(2)(ii) of this AD. Replacement of the fitting terminates the daily detailed inspection requirements of this paragraph. (ii) Except as required by paragraph (g)(2)(i) of this AD: Within 300 flight hours after accomplishing the conductivity inspection specified in paragraph (g) of this AD, do the action specified in paragraph (g)(2)(ii)(A) or (B) of this AD. As of the effective date of this AD, only the action specified in paragraph (g)(2)(ii)(B) of this AD may be done. (A) Replace the fitting with a new fitting in accordance with paragraph (2) of Part A of the Accomplishment Instructions of Bombardier Service Bulletin 84-54-14, Revision K, dated August 7, 2018. (B) Replace the rear spar nacelle attachment fitting and associated structure with a new nacelle attachment fitting, P/N 8Z9305, and do all applicable related investigative and corrective actions, in accordance with Part B of the Accomplishment Instructions of Bombardier Service Bulletin 84-54-16 Revision D, dated August 7, 2018. Do all applicable related investigative and corrective actions before further flight.

Unsafe condition

This AD was prompted by reports of cracked nacelle attachment fittings, which a preliminary investigation determined to be caused by stress corrosion. The FAA is issuing this AD to address this condition, which, if not detected and corrected, could compromise the structural integrity of the nacelle attachment fitting and possibly result in collapse of the landing gear.

Affected ADs

This AD replaces AD 2010-23-04, Amendment 39-16493 (75 FR 68174, November 5, 2010) (“AD 2010-23-04”).

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1