Airworthiness directives › 2021-11-24
AD 2021-11-24 Airworthiness Directives; The Boeing Company Airplanes
Models named: 737-600, -700, -700C, -800, -900, -900ER series. Read the applicability below — it usually turns on serial or part numbers too.
Applicability*9
This AD applies to The Boeing Company Model 737-600, -700, -700C, -800, -900, and -900ER series airplanes, certificated in any category, Line Numbers (L/Ns) 1 through 7596 inclusive, except L/Ns 7352, 7362, 7377, 7417, 7457, 7522, 7587, and 7592.
Compliance
Comply with this AD within the compliance times specified, unless already done.
Required actions
Within 60 days after the effective date of this AD, revise the existing maintenance or inspection program, as applicable, to incorporate the applicable information specified in Section A, including Subsections A.1., A.2., and A.3, of Boeing 737-600/700/700C/800/900/900ER Special Compliance Items/Airworthiness Limitations, D626A001-9-04, dated April 2019; or November 2020; except as provided by paragraph (h) of this AD. The initial compliance times for the airworthiness limitation instruction (ALI) tasks are within the applicable compliance times specified in in paragraphs (g)(1) through (14) of this AD. (1) For AWL No. 28-AWL-01, “External Wires Over Center Fuel Tank”: Within 120 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, or within 120 months after the most recent inspection was performed as specified in AWL No. 28-AWL-01, whichever is later. (2) For AWL No. 28-AWL-03, “Fuel Quantity Indicating System (FQIS)—Out Tank Wiring Lightning Shield to Ground Termination”: Within 120 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, or within 120 months after the most recent inspection was performed as specified in AWL No. 28-AWL-03, whichever is later. (3) For AWL No. 28-AWL-19, “Center Tank Fuel Boost Pump Automatic Shutoff System”: Within 12 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1206, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-19, whichever is latest. This AWL does not apply to airplanes that have complied with paragraph (s) of AD 2011-18-03. (4) For AWL No. 28-AWL-20, “Over-Current and Arcing Protection Electrical Design Features Operation—Boost Pump Ground Fault Interrupter (GFI)”: Within 12 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1201, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-20, whichever is latest. (5) For AWL No. 28-AWL-23, “Center Tank Fuel Boost Pump Power Failed On Protection System”: Within 12 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 12 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1248, or within 12 months after the most recent inspection was performed as specified in AWL No. 28-AWL-23, whichever is latest. This AWL does not apply to airplanes that have complied with paragraph (s) of AD 2011-18-03. (6) For AWL No. 28-AWL-24, “Spar Valve Motor Operated Valve (MOV) Actuator—Lightning and Fault Current Protection Electrical Bond”: Within 72 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28A1207, or within 72 months after the most recent inspection was performed as specified in AWL No. 28-AWL-24, whichever is later. (7) For AWL No. 28-AWL-29, “Full Cushion Clamps and Teflon Sleeving (If Installed) Installed on Out-of-Tank Wire Bundles Installed on Brackets that are Mounted Directly on the Fuel Tanks”: For airplanes having line numbers (L/N) 1 through 1754 inclusive, within 120 months after accomplishment of the actions specified in Boeing Service Bulletin 737-57A1279. For airplanes having L/N 1755 and subsequent, within 120 months after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, or within 48 months after the effective date of this AD, whichever is later. (8) For AWL No. 28-AWL-35, “Fuel Quantity Indicating System (FQIS)—Center Fuel Tank In-Tank Component and Wire Harness Protection Features-Separation from Center Tank Internal Structure”: For airplanes that have incorporated Boeing Service Bulletin 737-28-1356, within 120 months after accomplishment of the actions specified in Boeing Service Bulletin 737-28-1356, or within 120 months after the most recent inspection was performed as specified in AWL No. 28-AWL-35, whichever is later. (9) For AWL No. 28-AWL-37, “Fuel Quantity Indicating System (FQIS)—Built in Test Equipment (BITE) Test”: For airplane L/Ns 6987 and 7000 and subsequent, within 750 flight hours since the date the most recent BITE test was accomplished as specified in AWL No. 28-AWL-37, or within 750 flight hours after the effective date of this AD, whichever is later. (10) For AWL No. 47-AWL-04, “Nitrogen Generation System—Thermal Switch”: Within 22,500 flight hours after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 22,500 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 22,500 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-04, whichever is latest. (11) For AWL No. 47-AWL-06, “Nitrogen Generation System (NGS)—Cross Vent Check Valve”: Within 13,000 flight hours after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 13,000 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 13,000 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-06, whichever is latest. (12) For AWL No. 47-AWL-07, “Nitrogen Generation System (NGS)—Nitrogen Enriched Air (NEA) Distribution Ducting Integrity”: Within 6,500 flight hours after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, within 6,500 flight hours after accomplishment of the actions specified in Boeing Service Bulletin 737-47-1003, or within 6,500 flight hours after the most recent inspection was performed as specified in AWL No. 47-AWL-07, whichever is latest. (13) For AWL No. 47-AWL-09, “Nitrogen Generation System—Oxygen Sensor”: Within 18,000 flight hours after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness, or within 18,000 flight hours after the most recent replacement was performed as specified in AWL No. 47-AWL-09, or within 36 months after the effective date of this AD, whichever is latest. (14) For AWL No. 28-AWL-101, “Engine Fuel Suction Feed Operational Test”: Within 7,500 flight hours or 36 months, whichever occurs first, after the date of issuance of the original airworthiness certificate or the original export certificate of airworthiness; or within 7,500 flight hours or 36 months, whichever occurs first, after the most recent inspection was performed as specified in AWL No. 28-AWL-101; whichever is later.
Unsafe condition
This AD was prompted by significant changes made to the airworthiness limitations (AWLs) related to fuel tank ignition prevention and the nitrogen generation system (NGS). The FAA is issuing this AD to address the development of an ignition source inside the fuel tanks and also to prevent increasing the flammability exposure of the center fuel tank, which could lead to fuel tank explosion and consequent loss of the airplane. The FAA is also issuing this AD to prevent increasing the flammability exposure of the center fuel tank, which together with an ignition source in the fuel tank, could lead to a fuel tank explosion and consequent loss of the airplane. In addition, the FAA is issuing this AD to address the potential loss of engine fuel suction feed capability, which could result in dual engine flameouts, inability to restart engines, and consequent forced landing of the airplane.
Affected ADs
This AD affects the ADs specified in paragraphs (b)(1) through (7) of this AD. (1) AD 2008-06-03, Amendment 39-15415 (73 FR 13081, March 12, 2008) (AD 2008-06-03). (2) AD 2008-10-10 R1, Amendment 39-16164 (75 FR 1529, January 12, 2010) (AD 2008-10-10 R1). (3) AD 2008-17-15, Amendment 39-15653 (73 FR 50714, August 28, 2008) (AD 2008-17-15). (4) AD 2011-18-03, Amendment 39-16785 (76 FR 53317, August 26, 2011) (AD 2011-18-03). (5) AD 2013-15-17, Amendment 39-17533 (78 FR 52838, August 27, 2013) (AD 2013-15-17). (6) AD 2018-20-13, Amendment 39-19447 (83 FR 52305, October 17, 2018) (AD 2018-20-13). (7) AD 2018-20-24, Amendment 39-19458 (83 FR 51815, October 15, 2018) (AD 2018-20-24).
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1