TrackAD

Airworthiness directives › 2021-14-05

AD 2021-14-05 Airworthiness Directives; Airbus Helicopters Deutschland GmbH Helicopters

2021-08-18
2021-07-14
—
—
Airframe
—

Models named: MBB-BK 117 A-1, MBB-BK 117 A-3, MBB-BK 117 A-4, MBB-BK 117 B-1, MBB-BK 117 B-2, MBB-BK 117 C-1. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to all Airbus Helicopters Deutschland GmbH Model MBB-BK 117 A-1, MBB-BK 117 A-3, MBB-BK 117 A-4, MBB-BK 117 B-1, MBB-BK 117 B-2, and MBB-BK 117 C-1 helicopters, certificated in any category.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

Within 30 days after the effective date of this AD, review the log card (or equivalent record) and visually inspect each main rotor blade to determine if any bolted main rotor blades ( i.e., main rotor blade with bolted lead inner weight) are installed in accordance with paragraphs 2.A.1., 2.B.1., 2.B.2., and 2.B.3. of the Accomplishment Instructions of Eurocopter Alert Service Bulletin No. ASB-MBB-BK117-10-125, dated February 14, 2005. If during the review, the total hours time-in-service (TIS) cannot be positively determined, this AD requires treating that part as having accumulated more than 3,000 total hours TIS. If any bolted main rotor blade ( i.e., main rotor blade with bolted lead inner weight) is installed, replace the main rotor blade in accordance with paragraph 2.B.4. of the Accomplishment Instructions of Eurocopter Alert Service Bulletin ASB-MBB-BK117-10-125, dated February 14, 2005, as follows: (1) For a bolted main rotor blade that has accumulated less than 2,300 total hours TIS on the blade since bolting of the lead inner weight as of the effective date of this AD: Before accumulating 2,500 total hours TIS on the blade since bolting of the lead inner weights. (2) For a bolted main rotor blade that has accumulated 2,300 total hours TIS up to 3,000 total hours TIS inclusive, on the blade since bolting of the lead inner weight as of the effective date of this AD: Within 200 hours TIS after the effective date of this AD. (3) For a bolted main rotor blade that has accumulated more than 3,000 total hours TIS on the blade since bolting of the lead inner weight as of the effective date of this AD: Within 50 hours TIS after the effective date of this AD.

Unsafe condition

This AD was prompted by a report of sudden severe vibrations and a cracked open blade trailing edge caused by a loosened lead inner weight. The FAA is issuing this AD to address bolted lead inner weights of the main rotor blade, which could loosen and cause cracking of the open blade trailing edge. The unsafe condition, if not addressed, could result in loss of control of the helicopter.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1