Airworthiness directives › 2023-17-05
AD 2023-17-05 Airworthiness Directives; Schempp-Hirth Flugzeugbau GmbH Gliders
Applicability*9
This AD applies to Schempp-Hirth Flugzeugbau GmbH (Schempp-Hirth) Model Ventus-2a and Ventus-2b gliders, all serial numbers, certificated in any category.
Compliance
Comply with this AD within the compliance times specified, unless already done.
Required actions
(1) Within 40 days after the effective date of this AD and thereafter at intervals not to exceed 100 hours time-in-service (TIS), do the actions in paragraphs (g)(1)(i) and (ii) of this AD. (i) Inspect the airbrake bell cranks and airbrake drive funnels for cracking at the welding seams, in accordance with Action paragraphs (1a) and (1b) in Schempp-Hirth Technical Note 349-43, dated August 9, 2022 (Schempp-Hirth TN 349-43). (ii) Inspect the clearance of the airbrake control system, in accordance with Action paragraph (1c) in Schempp-Hirth TN 349-43; and Action paragraph (1.c) in Schempp-Hirth Working Instruction for Technical Note 349-43 dated August 9, 2022 (Schempp-Hirth Working Instruction TN 349-43). Where Schempp-Hirth Working Instruction TN 349-43 specifies “if in doubt” use plasticine lines, this AD requires using plasticine lines. Note 1 to paragraph (g)(1): This service information contains German to English translation. The European Union Aviation Safety Agency (EASA) used the English translation in referencing the document from Schempp-Hirth. For enforceability purposes, the FAA will refer to the Schempp-Hirth service information in English as it appears on the document. (2) If, during any inspection required by paragraph (g)(1)(i) of this AD, any cracking at the welding seams is detected, before next flight, do the applicable corrective actions in accordance with Action paragraph(s) (2a), (2b), (2c), and (2d), in Schempp-Hirth TN 349-43; and Action paragraph(s) (2.a), (2.b), (2.c), and (2.d), in Schempp-Hirth Working Instruction TN 349-43. Where Schempp-Hirth Working Instruction TN 349-43 specifies to purchase a new mounting plate with a reinforced airbrake bell crank installed from the manufacturer or its international representative, this AD does not specify the source from which new parts should be purchased. (3) If, during any inspection required by paragraph (g)(1)(ii) of this AD, it is determined that there is interference among the components of the airbrake control system and adjustments to the airbrake control system are needed, do those adjustments in accordance with a method approved by the FAA; EASA; or Schempp-Hirth's EASA Design Organization Approval (DOA). If approved by the DOA, the approval must include the DOA-authorized signature. (4) Unless already accomplished as required by paragraph (g)(2) of this AD, within 12 months after the effective date of this AD, replace the airbrake bell cranks with reinforced airbrake bell cranks and replace the airbrake drive funnels with reinforced drive funnels, in accordance with Action paragraph (2d) in Schempp-Hirth TN 349-43; and Action paragraph(s) (2.a), (2.b), (2.c), and (2.d), in Schempp-Hirth Working Instruction TN 349-43. Where Schempp-Hirth Working Instruction TN 349-43 specifies to purchase a new mounting plate with a reinforced airbrake bell crank installed from the manufacturer or its international representative, this AD does not specify the source from which new parts should be purchased. (5) Replacement on a glider of each airbrake bell crank and airbrake drive funnel with a reinforced airbrake bell crank and a reinforced airbrake drive funnel, as required by paragraph (g)(2) or paragraph (g)(4) of this AD, constitutes terminating action for the repetitive inspections required by paragraph (g)(1) of this AD for that glider. The initial inspection is required for all gliders.
Unsafe condition
This AD is prompted by reports of uncommanded extraction of the airbrakes on one or both wings, possibly resulting in reduced control of the glider. The FAA is issuing this AD to address this condition. The unsafe condition, if not addressed, could result in reduced control of the glider.
Affected ADs
None.
Read the original on the Federal Register →
You just looked this one up by hand
TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.
- Bring your existing list in from a spreadsheet Paste the rows straight out of Excel. Headers like C/W Date and N/A are read for you.
- A copy that works when this does not One file. No internet, no login, no this software running. For the morning something has to be produced and the computer is not cooperating.
- $5 a month, or $50 a year Up to 50 aircraft on either.
Look round a real shop first Start free
The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.
The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1