TrackAD

Airworthiness directives › 2024-23-10

AD 2024-23-10 Airworthiness Directives; ATR-GIE Avions de Transport Régional Airplanes

2025-01-13
2024-12-09
—
—
Airframe
—

Models named: ATR42-200, -300, -320, -500, ATR72-101, -102, -201, -202, -211, -212. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to ATR—GIE Avions de Transport Régional airplanes identified in paragraphs (c)(1) and (2) of this AD, certificated in any category, modified in accordance with FAA Supplemental Type Certificate (STC) ST116-004NM or STC ST04602NY. (1) Model ATR42-200, -300, -320, and -500 airplanes. (2) Model ATR72-101, -102, -201, -202, -211, -212, and -212A airplanes.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

Within 6 months after the effective date of this AD, modify the cargo compartment in accordance with the Accomplishment Instructions of Sabena Technics Airworthiness Technical Instructions 0110-09-A-ATI-F01-R00, dated September 19, 2023 (for Model ATR42 airplanes); or Sabena Technics Airworthiness Technical Instructions 0110-11-A-ATI-F01-R00, dated September 19, 2023 (for Model ATR72 airplanes).

Unsafe condition

This AD was prompted by a report that for airplanes converted from passenger to cargo configuration using certain supplemental type certificates, no height limitation for the cargo, when loaded in the cargo compartment, is defined, and that as a consequence, cargo may be loaded up to the ceiling of the cargo compartment. The FAA is issuing this AD to address cargo being loaded up to the ceiling of the cargo compartment, which could affect the proper functioning of the smoke detectors. This condition, if not corrected, could lead to smoke not being detected in time, possibly resulting in an uncontrolled fire.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1