TrackAD

Airworthiness directives › 2024-24-11

AD 2024-24-11 Airworthiness Directives; Cirrus Design Corporation Airplanes

2024-12-23
2024-12-06
—
—
Airframe
—

Makes named: cirrus. Models named: SR20, SR22, SR22T. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

This AD applies to Cirrus Design Corporation Model SR20, SR22, and SR22T airplanes, certificated in any category, that are equipped with upper power lever part number (P/N) 19181-001, 19181-002, or 46505-001.

Compliance

Comply with this AD within the compliance times specified, unless already done.

Required actions

(1) Initially, at whichever time occurs latest in paragraphs (g)(1)(i) through (iii) of this AD and thereafter at intervals not to exceed 110 hours time-in-service (TIS), visually inspect the upper power lever in accordance with paragraphs A. through F. of the Accomplishment Instructions in Cirrus SR2X Service Bulletin SB2X-76-05, dated October 29, 2024 (Cirrus SB2X-76-05). (i) Before any upper power lever identified in paragraph (c) of this AD accumulates 1,200 hours TIS, Note 1 to paragraph (g)(1)(i): These parts are not serialized. If by checking the logbook, you cannot determine how many hours the upper power lever has since installation, then you may use the hours TIS of the airplane. (ii) Within 10 hours TIS on the upper power lever after the effective date of this AD; or (iii) Within 15 days after the effective date of this AD. (2) If any crack(s) are found during any inspection required by paragraph (g)(1) of this AD, before further flight, replace the upper power lever with a new (zero hours TIS) upper power lever and do the actions in accordance with paragraphs L. through N. of the Accomplishment Instructions in Cirrus SB2X-76-05, as applicable. (3) If no crack(s) are found during any inspection required by (g)(1) of this AD, before further flight, perform a fluorescent penetrant inspection in accordance with paragraphs G. through J. of the Accomplishment Instructions in Cirrus SB2X-76-05. (i) If any crack(s) are found during any inspection required by paragraph (g)(3) of this AD, before further flight, replace the upper power lever with a new (zero hours TIS) upper power lever and do the actions in accordance with paragraphs L. through N. of the Accomplishment Instructions in Cirrus SB2X-76-05, as applicable. (ii) If no crack(s) are found during any inspection required by paragraph (g)(3) of this AD, reinstall the existing upper power lever and do the actions in accordance with paragraphs L. through N. of the Accomplishment Instructions in Cirrus SB2X-76-05, as applicable. (4) Cirrus SB2X-76-05 specifies to return cracked (damaged) upper power levers to Cirrus, this AD does not require that action but requires removing any cracked (damaged) upper power lever from service.

Unsafe condition

This AD was prompted by a report of failure of the upper power lever. The FAA is issuing this AD to detect and address cracks in the upper power lever. The unsafe condition, if not addressed, could result in loss of engine thrust control and reduced control of the airplane.

Affected ADs

None.

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1