TrackAD

Airworthiness directives › 98-20-09

AD 98-20-09 Airworthiness Directives; British Aerospace (Jetstream) Model 4101 Airplanes

1998-10-27
1998-09-22
39-10776
97-NM-339-AD
Airframe
—

Models named: 4101. Read the applicability below — it usually turns on serial or part numbers too.

Applicability*9

All Jetstream Model 4101 airplanes, certificated in any category. Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance

Required as indicated, unless accomplished previously. To prevent inability of the main entrance door to open, which could delay or impede passengers from exiting the airplane, or rescue personnel from entering the airplane during an emergency, accomplish the following: Restatement of Requirements of AD 97-19-02, Amendment 39-10122 (a) Within 30 days after September 24, 1997 (the effective date of AD 97-19-02, amendment 39-10122), perform a functional test to verify proper operation of the main entrance door (including the ``G'' lock system) and the ``speed'' lock system of the main entrance door, in accordance with Section 52-10-05 of BAe Jetstream Series 4101 Maintenance Manual (MM). (1) If the ``speed'' lock and the ``G'' lock function satisfactorily: Within 60 days after September 24, 1997, perform the actions specified in paragraphs (a)(1)(i) and (a)(1)(ii) of this AD. (i) Clean (remove existing contaminants and lubricant) and re- lubricate (with a dry lubricant) the ``speed'' lock and main entrance door ``G'' lock systems in accordance with Jetstream Service Bulletin J41-52-058, dated July 14, 1997. And, (ii) Following accomplishment of paragraph (a)(1)(i) of this AD, and prior to further flight, repeat the functional test specified in paragraph (a) of this AD. (A) If the ``G'' lock and the ``speed'' lock function satisfactorily in the functional test required by paragraph (a)(1)(ii) of this AD, accomplish the requirements of paragraph (b) of this AD. (B) If the ``G'' lock and the ``speed'' lock do not function satisfactorily in the functional test required by paragraph (a)(1)(ii) of this AD: Prior to further flight, repair the ``G'' lock and the ``speed'' lock in accordance with a method approved by the Manager, International Branch, ANM-116, FAA, Transport Airplane Directorate. (2) If either the ``speed'' lock and/or the ``G'' lock do not function correctly: Prior to further flight, perform the actions specified in paragraphs (a)(2)(i) and (a)(2)(ii) of this AD. (i) Clean (remove existing contaminants and lubricant) and re- lubricate (with a dry lubricant) the main entrance door ``speed'' lock and ``G'' lock systems in accordance with Jetstream Service Bulletin J41-52-058, dated July 14, 1997. And, (ii) Following accomplishment of paragraph (a)(2)(i) of this AD, and prior to further flight, repeat the functional test of the main entrance door (including the ``G'' lock system) and the ``speed'' lock system, in accordance with the MM. (A) If the ``G'' lock and ``speed'' lock function satisfactorily in the functional test required by paragraph (a)(2) of this AD, accomplish the requirements of paragraph (b) of this AD. (B) If the ``G'' lock and ``speed'' lock do not function satisfactorily in the functional tests required by paragraph (a)(2) of this AD: Prior to further flight, repair the ``G'' lock and ``speed'' lock in accordance with a method approved by the Manager, International Branch, ANM-116. (b) Perform the actions specified in paragraphs (b)(1) and (b)(2) of this AD within 1,500 hours time-in-service following accomplishment of the initial functional test of the main entrance door required by paragraph (a) of this AD. Repeat the actions specified in paragraphs (b)(1) and (b)(2) of this AD, thereafter, at intervals not to exceed 1,500 hours time-in-service. [[Page 50492]] (1) Clean (remove contaminants and dry lubricant) and re- lubricate (with dry lubricant) the main entrance door ``speed'' lock and ``G'' lock systems in accordance with Jetstream Service Bulletin J41-52-058, dated July 14, 1997. (2) Following accomplishment of paragraph (b)(1) of this AD and prior to further flight, perform a functional test of the main entrance door (including the ``G'' lock system) and the ``speed'' lock system, in accordance with the MM. If the ``G'' lock or ``speed'' lock system do not perform satisfactorily: Prior to further flight, repair the ``G'' lock or ``speed'' lock system in accordance with a method approved by the Manager, International Branch, ANM-116. New Requirements of This AD: (c) Within 60 days after the effective date of this AD, replace the ``G'' lock rollers on the main entrance door with new, improved ``G'' lock rollers in accordance with Jetstream Alert Service Bulletin J41-A-52-059, dated September 12, 1997, or Revision 2, dated January 23, 1998. (d) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, International Branch, ANM-116. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, International Branch, ANM-116. Note 2: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the International Branch, ANM-116. (e) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. (f) Except as provided by paragraphs (a), (a)(1)(ii)(B), (a)(2)(ii)(B), and (b)(2) of this AD, the actions shall be done in accordance with Jetstream Service Bulletin J41-52-058, dated July 14, 1997; and Jetstream Alert Service Bulletin J41-A-52-059, dated September 12, 1997; or Jetstream Alert Service Bulletin J41-A-52- 059, Revision 2, dated January 23, 1998. (1) The incorporation by reference of Jetstream Alert Service Bulletin 41-A-52-059, dated September 12, 1997; and Jetstream Alert Service Bulletin J41-A-52-059, Revision 2, dated January 23, 1998, is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. (2) The incorporation by reference of Jetstream Service Bulletin J41-52-058, dated July 14, 1997, was approved previously by the Director of the Federal Register as of September 24, 1997 (62 FR 47362, September 9, 1997). (3) Copies may be obtained from AI(R) American Support, Inc., 13850 Mclearen Road, Herndon, Virginia 20171. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. Note 3: The subject of this AD is addressed in British airworthiness directive 001-09-97. (g) This amendment becomes effective on October 27, 1998. Issued in Renton, Washington, on September 14, 1998. Dorenda D. Baker, Acting Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. 98-25029 Filed 9-21-98; 8:45 am] BILLING CODE 4910-13-P

Read the original on the Federal Register →

You just looked this one up by hand

TrackAD holds all 12,278 of them and matches them against the aircraft you actually look after — airframe, engine, propeller and appliances in one pass — then works out what falls due and when.

Look round a real shop first Start free

The demonstration shop is eleven real aircraft with a year of work behind them. No account needed.

The directive text above is reproduced from the Federal Register, a work of the United States government and in the public domain. The separation into applicability, compliance and required actions is TrackAD's.*1